BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Site work, paving, outdoor lighting and renovation of a mixed-use development in Daniel, Utah. Working plans call for the renovation of a playground / park / athletic field; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

Includes construction of a new community park located at 1650 North Ostler Peak Road in Heber City, Utah. The project will include approximately 13,000 SF of 3" asphalt trails, approximately 9,000 SF of concrete flatwork, approximately 310 LF of concrete retaining wall, approximately 0.2-acre pond construction, and landscaping and irrigation improvements. The project also includes installation of equipment provided by Heber City, including playground equipment, playground surfacing, pavilion including picnic tables with seating, picnic shelters including picnic tables with seating, park benches, and trash cans. The supply and installation of solar powered trail lights, streetlight, pond aerator with diffusers, and electrical connection at the pavilion are also included in this project. A bid alternate is also included with this bid for recreational trail construction at Cove Park located at 1875 Valley Hills Blvd, Heber City, Utah. Work includes approximately 340 LF of asphalt trail, a concrete canal crossing and concrete canal improvements, drainage improvements, and other recreational trail features. Questions: Questions to be submitted via email to Khevar McLeod - Sunrise Engineering khevar.mcleod@sunrise-eng.com. Deadline for questions is 2/19/2025 at 4:00 PM Cashier or Certified check or bid bond made payable to Heber City Corporation in an amount equal to at least five percent (5%) of the total amount of the bid Heber City Corporation reserves the right to accept or reject any or all bids, or any part of any bid, including the right to waive any informality in any part of any bid within the best interest of Heber City. No Award.

Final Planning

Playgrounds / Parks / Athletic Fields

$190,000.00

Public - City

Outdoor Lighting, Paving, Renovation, Site Work

94

16

58

4

Subscribe For Documents

127 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
55
Bidding Soon
1,038
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2025

March 26, 2025

Project location map

1650 N Ostler Peak Rd, Daniel, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.