Site work for a road / highway in Madison, Wisconsin. Working plans call for site work for a road / highway.
9638 - Country Grove Singletrack Trail Improvements 2025 This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways. SBE GOAL 10% BID BOND 5% Qestions regarding SBE Program requirements may be directed to Tracy Lomax, Affirmative Action Division. Tracy may be reached at (608) 267-8634, or by email, TLomax@cityofmadison.com. Work under this item shall include all costs associated with mobilization of the Contractor to the project location. Parking of equipment, storage of materials, and staging shall be allowed within the construction fencing shown on plans. The Contractor may only enter the construction site through the construction entrances as shown on the plans. The Contractor may not drive or store equipment on any portion of the park outside the construction limits unless indicated otherwise on plans or directed in the field. The quantity of clear stone included in this contract is sufficient to construct two typical construction entrances as shown on plans and per S.D.D 1.07. This item shall include the quantity of clear stone required for the construction entrance per BID ITEM 21011 - CONSTRUCTION ENTRANCE. If the Contractor choses to use additional clear stone it shall be at no additional cost to the City. Work under this item shall include all costs associated with removing existing topsoil for trail construction per bid items 90001-90004. Topsoil shall be replaced on trail side slopes and disturbed areas as shown on the plans and detail drawings. It is anticipated that salvaged topsoil shall be used on all side slope areas but contractor shall be aware that topsoil shall be placed in a matter that allows restoration, seeding, and matting. TERRACE SEEDING and bid item 21063 EROSION MATTING, CLASS I, TYPE A - ORGANIC are included in the contract as restoration items. Work under this item shall include the placement of a stone pad and paid as a construction entrance at the location shown in the plans and in accord with the City of Madison Standard Specifications and with the approval of the Engineer. Construction entrance shall be constructed at the size and location as approved by the Engineer. The Contractor shall place stone, ramping, and/or plating to avoid damage to concrete or asphalt. If any concrete or asphalt is damaged during construction the Contractor shall remove and replace damaged sections at no additional cost to the city. The Engineer shall determine any damaged sections to be replaced. Work under this item shall include all work, materials, labor and incidentals necessary for the Contractor to provide, install, maintain and remove construction fence from the project site as shown on the plans around the materials and construction equipment staging area. This fence shall be highly visible (orange), constructed of a plastic web, and able to withstand the expected amount of use it shall receive on a construction site. Relocation of fencing may be required as the work progresses. No extra payment shall be made for temporarily opening and re-closing the fence, or relocation of the fencing as needed to perform the work. Fencing shall be left in place until construction operations are complete. Work under this item shall include all work, materials, labor and incidentals necessary for the Contractor to provide, install, and construct the portions of Rock Armor Trail as shown on the plans. It is anticipated that this items shall be used to construct the northernmost 300' of trail 103 on the plans. This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways. The trail consists of natural material constructed using a "lift and tilt" method to create a sustainable surface. The trail will be an all-weather feature trail using a chip seal product to allow all weather use. Technical trail features are added to both trail type to enhance riding experience. These features are constructed of native stone and imported stone where needed. The trail corridor will be provided to the contractor in digital format via CAD or GIS and shall be verified by Contractor. The Contractor shall view the sites prior to bidding to become familiar with the existing conditions. The Contractor shall work with the existing utilities to resolve conflicts during the construction process. Bid item 20701 TERRACE SEEDING and bid item 21063 EROSION MATTING, CLASS I, TYPE A - ORGANIC are included in the contract as restoration items. The City intends to have the Contractor seed and mat all disturbed areas. The Contractor shall, perform the construction, execution and completion of the following listed complete work or improvement in full compliance with the Plans, Specifications, Standard Specifications, Supplemental Specifications, Special Provisions and Agreement; perform all items of work covered or stipulated in the Proposal; perform all altered or extra work; and shall furnish, unless otherwise provided in the contract, all materials, implements, machinery, equipment, tools, supplies, transportation, and labor necessary to the prosecution and completion of the work or improvements:
Final Planning
Roads / Highways
$343,319.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
March 15, 2026
Country Grove Dr, Madison, WI
Related To This Project
Madison, WI
Bid Date: Feb 13 2025
Madison, WI
Bid Date: Feb 13 2025
Madison, WI
Bid Date: Feb 13 2025
Madison, WI
Bid Date: Feb 28 2025
Madison, WI
Bid Date: Feb 25 2025
Madison, WI
Bid Date: Mar 27 2025
Madison, WI
--
Madison, WI
Bid Date: Feb 13 2025
Madison, WI
Bid Date: Mar 03 2025
Madison, WI
Bid Date: Feb 26 2025
Madison, WI
Bid Date: Feb 13 2025
Madison, WI
Bid Date: Feb 20 2025
Madison, WI
--
Madison, WI
Bid Date: Feb 04 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.