BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

This is a service / maintenance or supply contract in Greenwich Township, New Jersey. Contact the soliciting agency for additional information.

for Preliminary and Final Major Site Plan approval and C-variance approval, to allow the Applicant to construct a light manufacturing building of approximately 185.850SF with related infrastructure including approximately 138 trailer stalls, 54 loading docks, 28 van parking stalls, and 344 parking stalls, along with landscaping, lighting, road widening and stormwater management facilities. The Property is located in the ROM Zone District, which permits light manufacturing as a permitted use in the zone. As a result of the proposed development the Applicant is also seeking the following variances of the Greenwich Township Code pursuant to N.J.S.A. 40:55D-70(c): Maximum Accessory Building Height (A16-5.1.d.) where a maximum 15FT is permitted and 26.4FT is existing and proposed for the existing principal structure that will be converted to an accessory structure; Location of Accessory Buildings (A16-5.1 .b.) where the Applicant proposed an accessory structure in the front yard, which is prohibited; Minimum Accessory Front Yard Setback (A16-5.1.f.) where a minimum of 150FT is permitted and 67.6FT is existing and proposed for the existing principal structure that will be converted to an accessory structure; Right-Of-Way Improvements (A16-10.4.n.) where all new uses in nonresidential zones are required to provide curbs, sidewalks, and shade trees within the street right-of-way where none are proposed; Sidewalk Distance (From Building) (A16-18A.6.K.5.) where sidewalks are required a minimum of 10FT from a building and 5.5FT is proposed at the front of the building; Driveway Distance from Intersection (A16-18A.6.1.3.) where a distance less than 150FT is prohibited and 51.9FT is proposed; Pedestrian Walks (A16-18A.6.1.4.) where curbed pedestrians walks, not less than 8 FT wide, shall be provided between every second battery of parking alternating with landscaped islands as required and no pedestrian walks are proposed; Stream Corridor Setback (A16-4.16.) where no building, parking, or other disturbance shall be located within 250FT from the edge of the Musconetcong River and 160FT is proposed; Frontage Buffer (A16-4.14.d.(1).(d)) where a monument sign is proposed in the frontage buffer, which may not be permitted; Transition Buffer (A16-18A.6.s.(1)(a)) where a limit of disturbance measuring 100 feet shall be established from a property line that abuts with or is located across from a right-of-way or access easement from a residential zone or use and driveway improvements and a monument sign are proposed within 100FT; Transition Buffer (A16-18A.6.s.(1)(a)) where existing vegetation within the limit of disturbance shall be preserved and the proposed driveway will cause disturbance; Transition Buffer (A16-18A.6.s.(1)(c)) where clearing and grading within the limit of disturbance is prohibited and approximately 10% of the limit of disturbance buffer is proposed to be disturbed; Off-Street Parking (A16-10.4.d.) where no part of any off-street parking area shall extend into any required front yard more than the front yard setback requirement and parking is proposed for the existing principal structure that will be converted to an accessory structure; Site Lighting(A16-12B.2.(b).) where an average 0.5FC on vehicular area is required and 0.96FC is proposed; and Utilities (A16- 18A.6.p.) where all power and new telephone lines shall be placed underground and the exiting above ground power lines to the existing principal structure that will be converted to an accessory structure will remain. The Applicant is also requesting a design waiver for Maximum Industrial Driveway Width (A11-2.3.g.2.) where a maximum industrial driveway width of 35FT is permitted and 40FT is proposed. The Applicant may seek any additional variances and/or waivers as required by law or by the Greenwich Township Land Use Board. The application filed by Applicant will be on file with the Greenwich Township Land Use Board located at Greenwich Township Municipal Building, 321 Greenwich Street, Stewartsville, New Jersey at least ten days prior to the public hearing and may be inspected by all interested parties during normal business hours.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
892
Active Projects
379
Bidding Soon
7,109
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

Project location map

Multiple Locations, Greenwich Township, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.