BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated May 1, 2025

Site work and renovation of a water / sewer project in Greenwood Village, Colorado. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work generally consists of the installation of an Owner supplied 200 HP dry-pit configuration, centrifugal wastewater pump in position 2. The work includes associated demolition and replacement of pump base, interior process piping within the lift station, and miscellaneous electrical and controls for the pump. Bids will be received for a single prime Contract. Bids shall be on a lump sum basis, as indicated in the Bid Form. Upon TST's receipt of email requesting Bidding Documents, the Prospective Bidder will be added to the plan holders list and emailed instructions to download Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Bid security in the amount of five (5) percent of the total Bid Price must accompany each Bid and shall be furnished in accordance with the Instruction to Bidders. Bidders must be licensed to do business in the State of Colorado. Bids received from Bidders who are not recorded by the Issuing Office as having received the Bidding Documents will not be opened. The Owner reserves the right to award the contract by sections, or reject any or all Bids, and to waive any informalities and irregularities therein. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Question Deadline 02/27/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. 7.02 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$130,942.00

Public - County

Renovation, Site Work

16

18

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
69
Bidding Soon
1,196
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

April 7, 2025

Project location map

To Be Determined, Greenwood Village, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.