BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2025 at 7:00 PM

Updated February 26, 2025

Site work for a water / sewer project in Antonito, Colorado. Completed plans call for site work for a water / sewer project.

**As of February 24 2025, project was awarded to central pump company , awarded amount is $37,049,09 .** Subdistrict No. 3 of the Rio Grande Water Conservation District is seeking bids to rehabilitate a pumping plant on a well located on land just north of Antonito, CO. The pump has been pulled and column pipe, tube, and shafting are at the well site. Column pipe is to be reused, but two sections are to be replaced and another section added. Oil tube, shaft, and accessories are to be replaced. Bidders should itemize bids and should include the costs for: 1)Two 1-1/4 x 2 x 20 Tube and Shaft, 2) Eighteen 1-1/4 x 2 x 10 Tube and Shaft, 3) One 10 x 10 Column Pipe, 4) Two 10 x 20 Column Pipe, 5) One 18 x 10 Nipple, 6) One Pump, 400-1000 gpm, 210 of head at 1,000 gpm, 7) Fifty-two inches of 1-1/4 RD Stainless Steel Barstock, 8) Three 2-1/2 .250 Black Steel Pipes, 9) Two 1-1/4 10 Thread L-Shaft Couplers, 10) One 1-1/4 x 2 Bearing, 11) One 2 x 1-1/4 Tension Nut, 12) One 1-1/4 12 LH Head Shaft Nut, 13) One 75 HP US Motor 16, 14) Mobilization of a 12-T Rig, 15) Labor for Machine Work, Bowl Shaft, Head Shaft, Special Shaft, New Tension Box, Special Tube, Install 220 of Pipe, Install Pump. The pump needs to be designed for a minimum of 400 gpm to a maximum of 1,000 gpm using a 75 HP motor. GPM will be changed as needed with an existing VFD. Bids should also include a description of equipment to be used, the bidders qualifications, and the estimated date of completion. The completion date must be on or before March 15th, 2025. The Subdistrict reserves the right to accept the bid it deems most accurate for the scope of work proposed.

Award

Water / Sewer

$37,049.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
0
Bidding Soon
50
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2025

March 3, 2025

Project location map

To Be Determined, Antonito, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.