Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2025 at 8:00 PM
Updated April 2, 2025
Site work for a transportation facility in Boston, Massachusetts. Completed plans call for site work for a transportation facility.
These contracts are for systemwide track infrastructure improvements on the red, orange, blue, and green lines. Work will include replacement of ties, rail, restrained rail along both tangent, curved and restrained curve track, special trackwork, removal and replacement of broken or lock spike plates with pandrol plates, insulators and C-Bonds (where called for or where damaged by Contractor), contact rail replacement, ballast replacement (full depth and spot), joint elimination thermite welding, direct fixation and floating slab repairs including concrete repairs and replacement, surface line and tamping and track stabilizing where directed on both Light Rail and Heavy Rail portions of the MBTA system. CWR will require thermite welding and destressing in accordance with MBTA standards during scheduled surges. Work may require early action items like weekly meetings with contractors to plan and schedule work, moving rail, pre plating ties, site walks to finalize work limits, materials delivery, materials staging, equipment movement, schedule update, etc. Contractor will be required to remove all surplus materials generated by the project and all existing debris currently within the project limits. Debris to be removed will be confirmed during planned preconstruction site walks. While there is no DBE goal associated with this contract, the Authority strongly encourages the use of Minority, Women and Disadvantaged Business Enterprises as prime contractors, subcontractors and suppliers in all of its contracting opportunities. Electronic bids for MBTA Contract No. T90CN09,Track State of Good Repair Contract Ii, Systemwide, MA (Class 1, General Transit- $20,000,000; Class 3, Track Work- $20,000,000; Contract value $25,000,000,
Post-Bid
Transportation Terminals
$25,000,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
May 12, 2025
Multiple Locations, Boston, MA
Related To This Project
Boston, MA
Bid Date: Feb 25 2025
Boston, MA
Bid Date: Mar 13 2025
Boston, MA
Bid Date: Mar 13 2025
Boston, MA
Bid Date: Mar 20 2025
Boston, MA
Bid Date: Mar 06 2025
Boston, MA
Bid Date: Mar 27 2025
Boston, MA
Bid Date: Feb 26 2025
Boston, MA
Bid Date: Mar 21 2025
Boston, MA
Bid Date: Feb 12 2025
Boston, MA
Bid Date: Feb 12 2025
Boston, MA
Bid Date: Feb 12 2025
Boston, MA
Bid Date: Mar 14 2025
Boston, MA
Bid Date: Mar 13 2025
Boston, MA
Bid Date: Feb 19 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
