BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Demolition, asbestos abatement, new construction and renovation of a municipal facility in Boston, Massachusetts. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; for the renovation of a municipal facility; and for asbestos abatement for a municipal facility.

The scope of work includes partial demolition, new construction, asbestos abatement, removal and replacement of flooring, painting, HVAC, fire suppression and electrical as further detailed in the plans and specifications. The Age Strong Renovations project encompasses interior improvements to the Age Strong Department at the Boston City Hall, which includes selective demolition & asbestos abatement, new partition layout, new fixtures and finishes, acoustic treatments at ceilings, walls, & doors, and upgrades to MEP systems. Final completion within 120 days. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Age Strong Renovations are within the facilities of the Age Strong Commission, located at the following address: 1 City Hall Square Room 271 Boston, MA 02201. 15.3% for minorities and 6.9% for women.

Award

Municipal

$1,684,100.00

Public - City

Asbestos Abatement, Demolition, New Construction, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

20

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
3
Bidding Soon
1,995
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 26, 2025

Project location map

1 City Hall Square, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.