BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work for a mixed-use development in Conway, South Carolina. Completed plans call for site work for a fitness / recreation center; and swimming pool.

The City of Conway is accepting sealed proposals from qualified contractors to make renovations to the commercial indoor pool located at the Conway Sports & Fitness Center. This will include, but not limited to, re-plastering and tile replacements. Question Deadline 02/18/2025 Submit written questions to Amanda Hooper at: Fax # (843)397-2883, e-mail procurement@conwaysc.gov Start date of project must be April 3, 2025 and completed by May 1, 2025. o Main pool will be drained entirely. o Prior to the pool drained, a SCUBA diver must inspect the main drains to ensure that the sumps are intact and there is a hydrostatic valve. o Existing plaster will be chipped away from all main drains, gutters, return fittings, lights and any other penetrations. Any loose plaster or hollow spots will be removed. o Any delaminating plaster will be removed from the pool shell. o The entire pool surface will acid washed, neutralized and cleaned. o Waterline tiles will be replaced with 6 x 6 Frost Proof Tile. Colors and style selections TO BE DETERMINED. The tile area replaced will be the partition in between the main pool and zero entry. o Racing lanes and targets will be replaced. o The pool will be inspected for any structural concerns. If concerns are found, the main contact Karen Johnson will be notified immediately. o Bond / Scratch coat of plaster will be applied to entire surface of the pool shell to provide proper adhesion of plaster. o A QUARTZ surface will be applied to the entire pool shell. The total depth will be approximately 1/2 " finished surface color TO BE DETERMINED. Must meet requirements of SC DHEC and R61.51. o New 2"x2" black or blue tile will be added at step and depth transitions according to SC Code. o New VGB Main Drains Installed. o Pool surface will be lightly acid washed prior to refilling. o The pool will be re-filled and chemically balanced. Pool must be brushed no less than fifteen (15) times prior to vacuuming. o All chemicals needed to re-balance pool water chemistry must be included in your bid submission. o All trash generated by the project will be the contractor's responsibility and shall be removed from the work site. o Provide an estimated timeline for completing the project, including key milestones and any factors that could affect the schedule. o Provide detailed information on Plaster Warranty.

Post-Bid

Swimming Pools

$350,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
1
Bidding Soon
466
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

April 3, 2025

Project location map

1515 Mill Pond Rd, Conway, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.