BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work, new construction and renovation of an educational facility in Chicago, Illinois. Completed plans call for the expansion of a primary / secondary education facility.

The project consists of full replacement on all areas of the school and associated architectural, mechanical, electrical, plumbing, and controls scope as required for the roof replacement. Project includes refurbishing of mechanical equipment, replace plumbing and electrical components,, a new keyless entry system and a new BAS control system. Trades included but not limited to: Selective Demolition, Hazardous Materials, Lead-Based Paint Abatement, Indoor Air Quality Controls, Stone Masonry, Metal Ladders, Rough Carpentry, Roofing, Acoustical Ceilings, Painting Plumbing, HVAC, Electrical, Communications, Fire Detection & Alarm.

Post-Bid

Educational

$2,000,000.00

Public - City

New Construction, Renovation, Site Work

130

25

29

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
260
Bidding Soon
3,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

April 28, 2025

Project location map

5024 S Wolcott Ave, Chicago, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.