Published February 25, 2025 at 7:00 PM
Updated October 1, 2024
Demolition, site work, renovation and addition to a medical facility in Osceola, Iowa. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the renovation of a 22,000-square-foot medical facility; and for site work for a medical facility.
Clarke County Hospital (CCH) intends to enter a guaranteed maximum price (GMP) for a multi-phase series of projects throughout the hospital, consisting of approximately 22,000 square feet, which may include but is not limited to: renovation of select sections of the Inpatient Unit as Phase 1; demolition of the old hospital main entry and replacement of a new infusion addition, as well as renovation of the old infusion space for an ED Expansion, as Phase 2; relocation and new addition of the therapy services department along with renovation of the existing therapy services department for new lab space, and renovations to the existing lab space for a new office suite as Phase 3. Phase 1 construction is intended to commence in July 2025. Subsequent phases may begin design work during the start of construction of the previous phase so that construction between phases can run concurrently. CCH may choose to move forward with all, some, or none of the projects listed above. CCH will retain the services of a qualified, hospital-experienced construction management firm to assist the Owner, Architect and Engineering teams. The CMaR will be a critical member of the project team and will be expected to provide input on constructability, quality of materials, schedule (including phasing) and cost at several milestones prior to the completion of the construction documents. The successful CMaR will be responsible for driving the project quality, cost, and schedule to meet Owner needs, and will oversee bid, award and construction. The design team is currently working on Construction Documents for Phase 1 which is expected to start construction in June of 2025. The selected CMaR is intended to complete construction for this phase and is intended to continue as the CMaR for the implementation of the subsequent phases. CCH will be publishing a request for statements of qualifications (RFQ) for construction manager at risk (CMaR) services for the project on February 24, 2025. The CMaR will be engaged using a two-step solicitation process. A CMaR with sufficient qualifications based on the following selection criteria will be offered the opportunity to submit a proposal to serve as CMaR for the projects: A. Firm Overview B. Project Experience, Qualifications, and References C. Project Team D. Project Approach E. Management Process F. Differentiation Start Construction for Phase 1 July 2025 Question Deadline 02/28/2025 at 2:00 PM CT Questions about the selection process or the project shall be submitted via email to Melanie Boyd (mboyd@clarkehosp.org), copy Scott Kirchner (skirchner@bwbr.com) and Anna Pratt (apratt@bwbr.com) To properly evaluate each CMaR firm, and in accordance with Iowa State Law, Clarke County Hospital reserves the right to select the firm that offers the best value based on the criteria listed below and the ranking of each firm as it relates to the selection criteria.
GC Bidding
Medical
Public - County
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
July 1, 2025
800 S Fillmore St, Osceola, IA
Related To This Project
Osceola, IA
Bid Date: Feb 18 2025
Osceola, IA
Bid Date: Mar 07 2019
Osceola, IA
--
Osceola, IA
--
Osceola, IA
Bid Date: Dec 03 2024
Osceola, IA
--
Osceola, IA
Bid Date: Nov 19 2024
Osceola, IA
Bid Date: Oct 29 2024
Osceola, IA
Bid Date: Sep 17 2024
Osceola, IA
--
Osceola, IA
--
Osceola, IA
--
Osceola, IA
--
Osceola, IA
--
Osceola, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
RFQ Construction Manager at Risk - Clarke County Hospital - Phased Project
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.