BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Demolition, site work, renovation and addition to a medical facility in Osceola, Iowa. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the renovation of a 22,000-square-foot medical facility; and for site work for a medical facility.

Clarke County Hospital (CCH) intends to enter a guaranteed maximum price (GMP) for a multi-phase series of projects throughout the hospital, consisting of approximately 22,000 square feet, which may include but is not limited to: renovation of select sections of the Inpatient Unit as Phase 1; demolition of the old hospital main entry and replacement of a new infusion addition, as well as renovation of the old infusion space for an ED Expansion, as Phase 2; relocation and new addition of the therapy services department along with renovation of the existing therapy services department for new lab space, and renovations to the existing lab space for a new office suite as Phase 3. Phase 1 construction is intended to commence in July 2025. Subsequent phases may begin design work during the start of construction of the previous phase so that construction between phases can run concurrently. CCH may choose to move forward with all, some, or none of the projects listed above. CCH will retain the services of a qualified, hospital-experienced construction management firm to assist the Owner, Architect and Engineering teams. The CMaR will be a critical member of the project team and will be expected to provide input on constructability, quality of materials, schedule (including phasing) and cost at several milestones prior to the completion of the construction documents. The successful CMaR will be responsible for driving the project quality, cost, and schedule to meet Owner needs, and will oversee bid, award and construction. The design team is currently working on Construction Documents for Phase 1 which is expected to start construction in June of 2025. The selected CMaR is intended to complete construction for this phase and is intended to continue as the CMaR for the implementation of the subsequent phases. CCH will be publishing a request for statements of qualifications (RFQ) for construction manager at risk (CMaR) services for the project on February 24, 2025. The CMaR will be engaged using a two-step solicitation process. A CMaR with sufficient qualifications based on the following selection criteria will be offered the opportunity to submit a proposal to serve as CMaR for the projects: A. Firm Overview B. Project Experience, Qualifications, and References C. Project Team D. Project Approach E. Management Process F. Differentiation Start Construction for Phase 1 July 2025 Question Deadline 02/28/2025 at 2:00 PM CT Questions about the selection process or the project shall be submitted via email to Melanie Boyd (mboyd@clarkehosp.org), copy Scott Kirchner (skirchner@bwbr.com) and Anna Pratt (apratt@bwbr.com) To properly evaluate each CMaR firm, and in accordance with Iowa State Law, Clarke County Hospital reserves the right to select the firm that offers the best value based on the criteria listed below and the ranking of each firm as it relates to the selection criteria.

Award

Medical

Public - County

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
86
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

July 1, 2025

Project location map

800 S Fillmore St, Osceola, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.