Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Torrington, Connecticut. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Railroad Square Revitalization Project, scope includes the extension of the Sue Grossman Greenway from Water Street to 160 Church Street, including road, sidewalk, and crossing improvements along John Street, and the installation of 10 ft wide trail on John and Mason Street; construction of a new pedestrian promenade at 136 Water Street, creating a public walkway between the train station, greenway, parking, and community amenities, which will include green spaces, lighting, seating, and way-finding signage; and redevelopment of John Street including conversion to a one-way street with new granite curbing and sidewalks; as well as partial-depth reconstruction of Mason and Church Streets with new granite curbing, sidewalks, lighting, and minor drainage improvements; mill and overlay of Water Street with new sidewalks, paver amenity strip, bump outs, lighting, and minor drainage improvements; and a new parking lot and pocket park at Torrington Christmas Village and is designated AS "RAILROAD SQUARE REVITALIZATION PROJECT" for the City of Torrington. Project work: Road reconstruction/new parking lot/drainage improvements/sidewalks/curbing/lighting This contract is subject to state contract compliance requirements, including non-discrimination statutes and set-aside requirements. State Law requires a minimum of twenty-five(25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification from the Connecticut Department of Administrative Services. A bid bond in an amount not less than five percent (5%) of the amount of the bid shall accompany each bid. A non-collusion statement for Prime Contractor and any addendum acknowledgement must also be submitted at the time of the bid. The successful bidder will be required to provide a performance, labor, and materials bond in an amount equal to one hundred percent (100%) of the accepted bid. The contractor must demonstrate good faith effort to meet the 25% set-aside goals City reserves right to accept or reject any or all proposals; waive any informalities; negotiate & award a contract that it determines best meets their needs & best serve the interests of the City AN AFFIRMATIVE ACTION/EQUAL OPPORTUNITY EMPLOYER MBEs WBEs & SBEs ARE ENCOURAGED TO APPLY. All bids will be considered valid for a period of sixty (60) days. The City of Torrington reserves the right to accept or reject any or all bids, to waive technicalities, or to award the contract to a bidder other than the lowest bid, and to award the contract as it feels will best serve the public interest. 1) A - Richards Corporation - 614076 2) B - Yield Industries - 3467850 3) C - Yield Industries - 4174110

Award

Roads / Highways

$4,174,110.00

Public - City

Paving, Site Work

76

9

31

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Wood Shingles
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Graders

Find More Local Projects

Within 75 Miles of This Project
435
Active Projects
217
Bidding Soon
4,323
All Active Projects
1,876
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 14, 2025

img_map_placeholder

140 Main St, Torrington, CT

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Railroad Square Revitalization

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.