BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Renovation of an educational facility in Killeen, Texas. Completed plans call for the renovation of a educational facility.

Competitive Sealed Proposals (CSP) for the Reeces Creek Elementary School Roofing Project. Question Deadline 02/27/2025 at 2:00 PM CT Inquiries regarding this Request for Proposals, or requests for additional information, should be submitted through IonWave or via email to Theresa Camacho, Purchasing Specialist, at Theresa.Camacho@killeenisd.org Base Bid: 1. Replace Membrane Roofs as indicated in the Drawings: a. Remove existing roofing and flashings to deck, repair deck as required and as indicated at equipment to be removed. 1) Refer to roof system log for existing materials and locations. Carefully repair deck at damaged areas as specified. b. MEP Modifications: 1) Increase height of all existing curbs as required to provide a minimum of 12" base flashing height above the level of the new roof system. 2) Relocate existing penetrations and raise existing piping/conduit lines at locations identified on the drawings. 3) Remove and dispose of abandoned equipment. 4) Replace smoke vents at new roof areas as specified. 5) Provide new pipe supports at all existing gas, refrigerant, and conduit lines at new roof areas. 6) Replace all existing gas lines at new roof areas, prime and paint. 7) Remove existing abandoned penetrations and repair deck as indicated in the drawings. 8) Replace all existing roof drains and hose bibs c. Access Modifications: 1) Provide and install new roof hatches, safety rails and interior ladders as indicated on drawings. 2) Provide new roof warranty signs, quantity and size as indicated in the specifications, locations as determined by owner. d. Install new roof systems as specified: 1) Install mechanically fastened base sheet, polyisocyanurate insulation and coverboard as specified. 2) Install new fully adhered roof membrane and flashings. 3) Provide sheet metal flashings as specified. Provide new painted cast iron downspout boots at all locations discharging at grade. e. Walls: 1) Metal Wall Panel Above Roofs D, E: Install new plywood as specified, high temperature underlayment, hat channels and wall panels, and all associated flashings. f. Interior scope of work: 1) Replace up to 200 square feet of damaged (wet, stained, or broken) interior ceiling tiles to match existing, under roof areas replaced. 2) Paint underside of roof deck at MEP modifications where exposed to interior to match existing color and condition, at roof areas replaced only. g. Skylights: 1) Replace existing skylights and curbs as specified.

Award

Educational

$3,600,000.00

Public - City

Renovation

23

20

14

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
80
Bidding Soon
1,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.