Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 3, 2025 at 7:00 PM

Updated March 4, 2025

Site work and paving for a road / highway in Granton, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Lynn is requesting bids for pavement replacement. Please bid each item separately, giving a guaranteed maximum price, with unit prices stated for equipment, labor and materials. LRIP - TRID funding. Badger Avenue 1.5 miles from Starr Road to Sand Road. Hot Mix Asphalt Pavement (HMAP) 3 inches thick, 11.0 feet travel width per lane and 2.0 feet for shoulder. The Town reserves the right to reject any or all bids and/or reject the low bid for cause.

Post-Bid

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
21
Bidding Soon
647
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

April 2, 2025

Project location map

Badger Ave, Granton, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed