Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 25, 2025 at 8:00 PM
Updated April 26, 2025
Site work for a road / highway in Statesboro, Georgia. Completed plans call for site work for a road / highway.
**As of April 25, 2025, the project was awarded to Tidwell Traffic Solutions, with an awarded amount of $74,030.25.** The work in this contract includes the installation of thermoplastic striping of approximately 4.66 miles of city streets. The thermoplastic striping shall include 5 inch white and yellow solid striping, 5 inch white and yellow skip striping, 8 inch white solid striping, 24 inch white solid striping, type 2 turn Arrows, and yellow hatching. The City of Statesboro requests submittals of qualifications and invitation to bid from qualified contractors for the striping of roads within the City of Statesboro (COS). All roads can be located on the location map provided in this ITB package. Question Deadline 03/05/2025 Any questions concerning this bid request shall be made in writing to Darren Prather, Director of the Department of Central Services, at email address darren.prather@statesboroga.gov or at P.O. Box 348, Statesboro, GA 30459. It is the intent of the City of Statesboro to encourage participation by minority and female owned business enterprises (MFBE) for all procurement processes. The construction phase of this project shall include a minimum 20% minority or female business enterprise participation of total construction cost. All submittals for this RFQ must include a statement acknowledging compliance with 20% MFBE requirement at time for submittal of sealed bids. Upon submittal of sealed bids pre-qualified contractors will be required to provide proof of MFBE certification if general/prime contractor is a certified MFBE or provide list of MFBE sub-contractors, identify % of participation by each sub-contractor and proof of minority or female owned business certification for proof of compliance with this section requirement. All bids shall be accompanied by a bid bond for five percent (5%) of the total bid (no personal or company checks are accepted). A performance bond and a payment bond equal to 100 percent (100%) of the awarded bid price must be provided at the time the contract is awarded. All bonds must meet qualifications acceptable to the City of Statesboro, and shall be secured from bonding companies licensed to do business in the State of Georgia. The City of Statesboro reserves the right to reject any or all bids and to waive technicalities or informalities. For more information, contact the City of Statesboro Director of the Department of Central Services, Darren Prather, at (912) 764-0642.
Award
Roads / Highways
$74,030.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2025
April 11, 2025
Multiple Locations, Statesboro, GA
Related To This Project
Statesboro, GA
Bid Date: Feb 27 2025
Statesboro, GA
--
Statesboro, GA
Bid Date: Mar 13 2025
Statesboro, GA
Bid Date: Mar 13 2025
Statesboro, GA
Bid Date: Apr 03 2025
Statesboro, GA
Bid Date: Apr 30 2025
Statesboro, GA
Bid Date: Apr 30 2025
Statesboro, GA
Bid Date: Apr 09 2025
Statesboro, GA
Bid Date: Mar 10 2025
Statesboro, GA
Bid Date: Mar 10 2025
Statesboro, GA
Bid Date: Apr 04 2025
Statesboro, GA
Bid Date: Feb 05 2025
Statesboro, GA
Bid Date: Feb 05 2025
Statesboro, GA
Bid Date: Feb 10 2025
Statesboro, GA
Bid Date: Feb 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
