Published March 10, 2025 at 8:00 PM

Updated March 15, 2025

Site work and paving for a mixed-use development in Sault Ste. Marie, Ontario. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The excavation of the current main parking lot/loading ramp area, which will include re-structuring, re-grading, adding retain walls, drainage and paving as per the prepared drawings and specifications. The existing parking lot/loading ramp at the Tarentorus Fish Culture Station does not allow for transport trucks to enter the loading dock to unload feed due to the grade being to steep. Therefore, the existing area is to be restructured to allow transport truck to enter the loading dock so feed can be unloaded from the transport in a safe manner. The intent of this project is to regrade the parking lot and loading dock at the Tarentorus Fish Culture Station so that transport trucks can enter the loading bay as outlined in the contract documents. The scope generally comprises the following: - Obtain, and pay for, public and private locates for the construction area - Provide any dewatering required for the installation of the Works - Sawcut and remove the existing asphalt as shown on the drawings (remove asphalt from site) - Excavate and regrade the existing soils as shown (excess fill to be placed in a location onsite as directed by the Fish Culture Station Manager) - Supply and install new storm catch-basins and manholes as shown - Supply and install new storm piping as shown and connect to existing catchbasin-manhole - Supply and install retaining walls as shown - Supply and place new concrete curb as shown - Establish swales as shown and restore swales with topsoil, seed, and mulch - Supply and place new asphalt complete with step joints as shown - Repaint new lines in the parking lot - Third-party compaction testing, concrete testing, and asphalt testing shall be arranged, and paid for, by the Contractor. Documents can be obtained from https://ontariotenders.app.jaggaer.com

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

7

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
12
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

April 14, 2025

Project location map

Fish Hatchery Rd, Sault Ste. Marie, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed