Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Site work and paving for a mixed-use development in Arden Hills, Minnesota. Completed plans call for site work for a municipal facility; road / highway; and for paving for a road / highway.

Site Address: Arden Hills, Eagan, and Plymouth, MN City: Multiple County: Hennepin/Mult. State/Province: MN Site Directions: Plymouth DVS 2455 Fernbrook Ln N., Arden Hills DVS 5400 Old Highway 8, Eagan DVS 2070 Cliff Rd. Est. Value: $ 5,536,087.00 Est. Completion Date: May 31, 2025 Question Deadline 02/21/2025 at 12:00 PM CT TG/ED/VO subcontracting goals will not be a consideration in the contract award The work will be done under one prime contract that includes: Each station requires reconstruction of the pavement and concrete surfaces. Bituminous pavements and curbs shall be reclaimed and repaved. Concrete pavements and curb shall be removed and replaced. Erosion control measures shall be installed during construction. Other installation items may include concrete cross-gutters, aprons, patios, stairs, fencing and miscellaneous items. Landscaping to include sod and restoration work after installation. Each of the stations will be closed to the public during the allotted construction period. 1. Plymouth Exam Station is scheduled to be completed first. Anticipated construction start is April 1, 2025. COMPLETION MUST BE ON May 31, 2025, upon which the station will be re-opened. a. Reclaim existing bituminous roads b. Remove existing concrete curbs, walks, aprons c. Install new concrete curbs, walks, aprons d. Install new bituminous pavement e. Restoration of disturbed areas f. Provide topographic survey, construction staking, materials testing 2. Arden Hills Exam Station is scheduled to be completed second. Anticipated construction start is May 1, 2025. COMPLETION MUST BE ON JUNE 30, 2025, upon which the station will be re-opened. a. Reclaim existing bituminous roads b. Remove existing concrete curbs, walks, aprons c. Install new concrete curbs, walks, aprons d. Install new bituminous pavement e. Restoration of disturbed areas f. Provide topographic survey, construction staking, materials testing 3. Eagan Exam Station is scheduled to be completed last AND IS AN ALTERNATE project. Anticipated construction start is September 1, 2025. COMPLETION MUST BE ON NOVEMBER 1, 2025,upon which the station will be re-opened. a. Reclaim existing bituminous roads b. Remove existing concrete curbs, walks, aprons c. Install new concrete curbs, walks, aprons d. Install new bituminous pavement e. Restoration of disturbed areas f. Provide topographic survey, construction staking, materials testing This Project has a 10% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal assigned. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor.

Award

Municipal

$2,549,621.00

Public - State/Provincial

Paving, Site Work

53

11

8

8

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
133
Bidding Soon
1,474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

April 1, 2025

Project location map

Multiple Locations, Arden Hills, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.