Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2025 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Portland, Oregon. Completed plans call for site work for a water / sewer project.
City of Portland Swan Island Combined Sewer Overflow (SISCO) Pumps Stations 1, 3 and 5 Improvements Construction On all construction projects the successful bidder shall be required to certify that he/she is in compliance with ORS 279C.800 to 279C.870 or the Davis Bacon Act, 40 USC 3141 to 3148 relative to prevailing wage rates. On projects where bidders are required to be prequalified, the bidder must be prequalified by Procurement Services in the stated category for an amount equal to the amount shown in the project description in this advertisement. Additional prequalification requirements may be described in the project specifications. A prequalification application must be filed with Procurement Services at least ten (10) calendar days prior to the last day for receipt of bids, unless stated otherwise in the bid documents. Additional forms disclosing first tier subcontractors are due by 4:00 PM. The City encourages bidding by COBID certified firms and will assist such firms to understand and participate in the formal bidding processes. BID NO. 00002510 Description: Swan Island Combined Sewer Overflow (SICSO) Pumps Stations 1, 3 and 5 Improvements: Prequalification Required in category 10 - Sewage Pumping Stations in the amount of $2,100,000 for Prime Contractors and Special Prequalification Required in category 33 (BES) - Boiler Making/Steam Fitting/Pipeline Fabrication In the amount of $500,000 for Prime or Subcontractor. A separate Special Prequalification Application is required for this project. The City has determined that this project is of a size, scope, or complexity that requires special prequalification. The Special Prequalification Application is contained within this Bid Book and must be filed with Procurement Services by the due date stated on the application cover, by all contractors planning to submit a bid for this project. Refer Questions to: Mahn Saechao Sr. Procurement Specialist Phone: (503) 823-8323 Mahn.Saechao@portlandoregon.gov
Bid Results
Water / Sewer
$2,095,650.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 12 - Furnishings
Division 23 - Heating Ventilating and Air Conditioning
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
May 26, 2025
4199 N Port Center Way, Portland, OR
Related To This Project
Portland, OR
--
Portland, OR
--
Portland, OR
--
Portland, OR
Bid Date: Mar 05 2025
Portland, OR
Bid Date: Mar 06 2025
Portland, OR
Bid Date: Mar 11 2025
Portland, OR
Bid Date: Mar 06 2025
Portland, OR
--
Portland, OR
Bid Date: Mar 27 2025
Portland, OR
--
Portland, OR
Bid Date: Mar 12 2025
Portland, OR
Bid Date: Feb 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Swan Island Combined Sewer Overflow (SICSO) Pump Station Pumps 1, 3 and 5 Improvements
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.