EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Davenport, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

CY 2025 Sidewalk and ADA Ramp Program Question Cut Off Date 2/19/2025 09:00:00 AM (CT) Submit your questions via to questions tab. For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the Response Attachments tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - Working days will commence once curb and/or sidewalk has been removed from one or more locations, and the Contractor shall prosecute the work continuously at those locations until the work is substantially complete (all pavement backfilled and open to use). The Contractor shall schedule and execute the work such that no more than five (5) working days elapse between the time that curb and/or sidewalk removal begins at a location and work on the next controlling item begins at the same location. Sod may be placed separately without working days counting, however payment for the location will not be made until sod is placed and only minor punch list items may remain Liquidated Damages - Liquidated damages shall be $200 per day, per location up to $1,000/day, for areas not complete within five (5) working days after the start of work at a given location. All assigned work shall be completed, including final cleanup and removal of all equipment for the bid no later than November 1st, unless modified by change order. Liquidated damages shall be $200 per day, per location up to $1,000/day, where assigned work is not completed beyond November 1st The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so.

Bid Results

Sidewalks / Parking Lot

$1,107,170.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Closeout Submittals, Warranties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
40
Bidding Soon
706
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 3, 2025

img_map_placeholder

Multiple Locations, Davenport, IA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

CY 2025 Sidewalk & ADA Ramp Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.