Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 9, 2025 at 8:00 PM
Updated April 10, 2025
Site work and paving for a mixed-use development in Orinda, California. Completed plans call civil work for an educational facility, playground / park / athletic field and water / sewer project.
** As of April 9,2025 , this project has not yet been awarded. The project is expected to be awarded on April 14,2025.** The Engineer's Estimate is $348,000. The Project consists of: Re-grade and level existing AC paved Kinder Play Yard. Install new play structure (OFCI-owner furnished, contractor installed) over poured-in-place safety surfacing. Install two (2) new shade structures (PC #04- 121917)(OFCI-owner furnished, contractor installed). Install new drinking fountain, add striping and play equipment, install new 6 foot high accessible gates at play area, and revise existing fencing. Scope includes associated ADA upgrades and path of travel, as well as storm drain work. The contractor will be responsible for receiving the play yard equipment and the shade structures, as well as staging and safekeeping of these OFCI items until they are ready for installation. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders. As security for its Bid, each Bidder shall provide with its Bid form o a bid bond issued by an admitted surety insurer on the form provided by the District, o cash, or o a cashier's check or a certified check, drawn to the order of the Orinda Union School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful Bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no Bidder may withdraw its bid for ninety (90) days after the date of the bid opening. Question Deadline 03/13/2025 All questions about the meaning or intent of the Contract Documents are to be directed in writing to the District. Questions received less than SEVEN (7) calendar days prior to the date for opening Bids may not be answered.
Bid Results
Playgrounds / Parks / Athletic Fields
$297,300.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2025
April 15, 2025
25 El Camino Moraga, Orinda, CA
Related To This Project
Orinda, CA
Bid Date: Mar 11 2025
Orinda, CA
Bid Date: Apr 21 2025
Orinda, CA
Bid Date: Jul 02 2025
Orinda, CA
Bid Date: Jun 17 2025
Orinda, CA
Bid Date: Jul 08 2025
Orinda, CA
Bid Date: Aug 05 2025
Orinda, CA
Bid Date: Aug 12 2025
Orinda, CA
Bid Date: Sep 03 2025
Orinda, CA
Bid Date: Jan 28 2025
Orinda, CA
Bid Date: Oct 22 2024
Orinda, CA
Bid Date: Aug 13 2024
Orinda, CA
Bid Date: Aug 06 2024
Orinda, CA
Bid Date: Mar 18 2025
Orinda, CA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
