Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 20, 2026 at 8:00 PM
Updated May 20, 2026
Site work, paving and new construction of a civil project in Orinda, California. Completed plans call for site work for a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; and road / highway.
The Project is located on Route 24 in the City of Orinda and Berkeley from Post Mile R5.8/R6.2 in Alameda County to Post Mile R0.0/R0.6 in Contra Costa County. The project proposes rehabilitating the Caldecott Tunnel Bores No. 1, No. 2, and No. 3. The project would preserve the structural integrity of the tunnels, improve ventilation performance and firefighting operational response, and extend the service life of the tunnels. The rehabilitation scope includes repair and patch spalls, remove and repair unsound concrete, delamination, rust and efflorescence identified within the wall and ceiling of the tunnels and plenums. The rehabilitation scope includes structural pavement, tunnel underdrain, electrical lighting and other electrical work. SWPP, concrete barrier, temporary traffic control systems, roadside signs, erosion control, excavation, electrical, demolition, tunnel temporary ventilation, clearing & grubbing, pumps, pipe supports, CMU, guardrail, tunnel temporary electrical, striping, drainage inlets, pipe inlets & grates, mobil barrier systems, landscaping, rebar, traffic control, furnish/erect structural steel, jet fans, sweeping, clean bridge deck surface, 316sss wsp, fittings, & valves, metal doors (pump room), biological monitoring, misc, metals, construction area signs. ** Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, & current insurance meeting Myers - Obayashi requirements. Subcontractors will be required to sign the standard Myers - Obayashi Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 460-8502 or email Mike Lewis at estimating@myers-sons.com. ** **Please call if you need assistance in obtaining bonding, insurance, equipment, materials &/or supplies. Myers - Obayashi will work cooperatively with all qualified firms seeking work on this project. Myers - Obayashi is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers - Obayashi is an equal opportunity employer. ** ** All items are open for bid, including items of work normally performed. Quotations will be broken down into comparable packages as reasonably necessary. Myers - Obayashi will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. **
Award
Bridges / Tunnels
$220,000,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
