BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2025 at 8:00 PM

Updated April 11, 2025

Site work for a civil project in Lac La Biche, Alberta. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.

The major items of work include the following approximate quantities: 1 . General requirements including mobilization, de-mobilization and survey layout etc. 2. 11,020m3 (300mm depth) topsoil and organic matter stripping stockpiling, re-using, hauling to a designated area and/or dispose off (subject to site condition and deletion) 3. 2,340m2(150mm depth) saw cut existing pavement, removing, stockpiling, re-using, hauling to a designated area and/or dispose (subject to site condition and deletion) 4. 5,120m2 cold mill existing pavement (70mm deptti, 2m wide, subject to site condition and deletion) 5. 22,860m3 common excavation, stockpiling, re-using, hauling to a designated area and/or dispose off (subject to site condition and deletion) 6. 2,190m ditch reconstruction complete including erosion protection, topsoil and seeding (3.5m Wide; subject to site condition and deletion) 7. Remove 2 existing 600 dia. CSP culverts, haul to designated area and/or dispose of (subject to site condition and deletion) 8. Relocate (uninstall and reinstall complete) 2 light standards as per Alberta Transportation guidelines / regulations 9. Supply and install 73m, 600mm diameter, 2 CSP culverts 10. Supply and install 8,160m3 new sub-grade (600mm depth clay, subject to site condition and deletion) 11. Supply and install 3,740m3 new granular base course (DES 2 Class 25, 350mm depth; subject to site condition and deletion) 12. Supply and install 7,260m2 geotextile & geogrid (subject to site condition and deletion) 13. Supply and install 6,860m2 new hotmix asphalt concrete paving (80mm ACP, M1 PG 58-28, subject to site condition and deletion) 14. Supply and install 4,890m2 new hotmix asphalt concrete paving (70mm ACP, M1 PG 58-28, subject to site condition and deletion) 15. Supply and install new 7,260m2 hotmix asphalt concrete paving (Final lift. 70mm ACP, M1 PG 58-28, subject to site condition and deletion) 16. Supply & install 7,260mz cement stabilization (25Kg/m2/300mm, subject to site condition and deletion) 17. All pavement markings and signage complete (according to dwg. 1004) 18. Supply and install 18,600m2 new topsoil (100 mm depth; subject to site condition and deletion) 19. Supply and install 14,600m2 seeding (subject to site condition and deletion) 20. Supply and install 4,060m2 sod (subject to site condition and deletion) 21. Supply and install 18,600m2 new topsoil (100 mm depth; subject to site condition and deletion) 22. Supply and install 14,600m2 seeding (subject to site condition and deletion) 23. Supply and install 4,600m2 sod (subject to site condition and deletion)

Award

Roads / Highways

$2,840,068.00

Public - County

Site Work

15

13

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
59
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

May 1, 2025

Project location map

AB-55 & Range Rd 142, Lac La Biche, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.