BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Site work and paving for a mixed-use development in Arnprior, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project includes scopes of work in three locations within Arnprior. The first being reconstruction of 200m of MacDonald street including sanitary sewer and watermain. This section of MacDonald street intersects Edey street. Reconstruction on Edey street includes 330m of surface work (road surface, base, sidewalk, curbs) as well as 200m of watermain and sanitary sewer replacement. The second work location is the resurfacing of Vancourtland Street from Elgin Street to the North dead end. The third work location is at the intersection of Leo Moskos Street and Baskin Drive. Scope includes the installation of an illuminated pedestrian crossover, sidewalk and relocation of a school zone flasher on Baskin Drive. The reconstruction of Edey Street from Allan Drive to Edward Street and MacDonald Street from Edey Street to 105 MacDonald Street (a distance of 565m), rehabilitation of Vancourtland Street North from Elgin Street northwesterly to the dead end (a distance of 125m) and the construction of a PXO on Baskin Drive at Leo Moskos Street, including grading, granular base, hot mix paving, concrete curb, concrete sidewalk, storm sewers, sanitary sewers, water system, and landscape restoration. The Contractor further agrees that they will deliver the whole of the works completed in accordance with this Agreement within the time stipulated in the Special Provisions - General entitled "Project Schedule & Liquidated Damages". The Contractor agrees that any monies due the Corporation as a result of non-completion of the works within the time stipulated may be deducted from any monies due the Contractor on any account whatsoever. IN CONSIDERATION WHEREOF, Said party of the second part agrees to pay the Contractor for all work done, based on the unit prices of the Tender. This Agreement must inure to the benefit of and be binding upon the heirs, executors, administrators, and assigns of the parties hereto. Acceptance of the Contractor's offer by the Corporation and execution of this Agreement by the Contractor must constitute a legally binding agreement between both parties. Each tender must be accompanied by a certified cheque, money order, bank draft, or bid bond, in the amount equal to or greater than 10% of the amount of the Tender, payable to the Municipality, and it must be as attached as a PDF the tender. Bond totalling Fifty Percent (50%) of the Contract amount, and conforming to the Instruments of Contract attached hereto, for the full and due performance of the works shown as described herein and a Bond totalling Fifty Percent (50%) Question Deadline 03/11/2025 at 5:00 PM ET Official bid documents must be obtained from www.merx.com .

Award

Roads / Highways

$3,039,900.00

Public - City

Paving, Site Work

38

7

37

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
84
Bidding Soon
1,095
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2025

April 14, 2025

Project location map

Multiple Locations, Arnprior, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.