BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2025 at 8:00 PM

Updated March 27, 2025

Renovation of a municipal facility in Grand Forks, North Dakota. Completed plans call for the renovation of a municipal facility.

General Work: Furnish and install new exhaust ductwork, brackets, and reattach existing ductwork. To access the electronic bid form, obtain the project documents online. Prospective bidders must be on the Planholder list through online for bids to be accepted. The scope of work generally consists of the following: Bids will be lump sum price. Est. Value: $ 35,500.00 All work is to be in accordance with the Bidding Documents which are on file in the office of the City Engineer, Grand Forks, North Dakota, reference to which is made for detailed description of the work. Each bid must be accompanied by a separate PDF document (uploaded to online) containing an acceptable bidder s bond in a sum equal to five percent of the full amount of the bid, executed by the bidder as principal and by a surety, conditioned that if the principal s bid be accepted and the contract awarded to the principal, the principal, within ten days after notice of award, will execute a contract in accordance with the term of the bid and a contractor s bond as required by law and the regulations and determinations of the Grand Forks City Council. Each bid shall also contain a PDF document (uploaded to online) of the Contractor s License or certificate of renewal thereof issued by the Secretary of State which will be uploaded. Bidder must be licensed for the full amount of the bid. No bid will be read or considered which does not fully comply with the above provisions as to bond and license. The City Council reserves the right to reject any or all bids and/or to waive any informality in the bids received and to accept any bid deemed to be most favorable to the interest of the City of Grand Forks. The successful bidder shall warrant and guarantee work for two years and shall furnish performance and payment bonds, in the amount of 100% of the contract. Bonds shall remain in effect until two years after date of final payment. Within fifteen (15) days after effective date of Agreement, Contractor shall submit to Owner a written notice indicating the specific date that Contractor will begin construction. Unless extended as per Article 11 of the General Conditions, Milestone A (All work requiring bypass pumping) shall be completed within 2 calendar days for each site, and all work shall be completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions no later than August 30, 2025. Question Deadline 02/25/2025 All questions about the meaning or intent of the Bidding Documents are to be directed to the Engineer and shall be submitted to: Mr. Ben Williams, PE Principal Engineer Webster, Foster, & Weston 1616 Mill Road Grand Forks, North Dakota 58203 ph: (701) 775-8118

Award

Municipal

$98,800.00

Public - City

Renovation

10

15

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

April 7, 2025

Project location map

Multiple Locations, Grand Forks, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.