BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

This is a service / maintenance or supply contract in Whistler, British Columbia. Contact the soliciting agency for additional information.

Feasibility analysis of three potential replacement options for the gas boilers in the Primary Building of the Wastewater Treatment Plant (WWTP). The goal is to identify and recommend the most suitable replacement option that meets the operational, environmental and budgetary needs of the RMOW. TIMELINE: Request for proposal to undertake a detailed evaluation and feasibility analysis, has been issued by the owner. Further update in late spring 2025 upon approvals. *This study will be partially or fully funded by BC Hydro; therefore, the successful Proponent must be a BC Hydro Alliance member.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
1
Bidding Soon
998
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

Project location map

1135 Cheakamus Lake Rd, Whistler, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.