BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Smethport, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Question Deadline 02/25/2025 at 12:00 AM ET Questions through Online Portal The work shall consist of replacing the Bordell Road (T-349) bridge over South Branch Cole Creek. The existing stone abutment, steel beam bridge will be replaced with a Geosynthetic Reinforced Soils Integrated Bridge System (GRS-IBS) with adjacent box beams, a cast-in-place deck and vertical wall concrete barriers. Contractor shall purchase all materials necessary for the project. Bidders must provide with their Proposal (or Bid) either a certified bank treasurer's check, a certified cashier's check payable to the order of Keating Township, or a bid bond in the amount of ten percent (10%) of the bid. Bidders must also provide with their Proposal a fully completed Non-Collusion Affidavit and a Public Works Employment Verification Form. Bidders are advised that PA Prevailing Minimum Wage Rates are incorporated in the Contract Documents and they must be paid to all workers employed at the construction site. Failure to fully comply with all bid requirements including but not limited to the above will cause to be reject a bid. Bidders are advised that PA Prevailing Minimum Wage Rates must be paid to workers employed on this project and are incorporated in the Contract Documents. These wage rate requirements are applicable to this contract for the entire duration of this project. Keating Township may hold all Bids and they shall remain irrevocable for 60 days from the Bid Opening date. Keating Township reserves the right to accept or reject any or all bids, waive any informalities or irregularities, or negotiate contract amounts. The successful Contractor will be required to furnish upon Contract Award a Performance Bond and a Payment Bond, each for one hundred (100%) percent of the contract price as bid

Post-Bid

Bridges / Tunnels

$600,000.00

Public - City

Demolition, New Construction, Paving, Site Work

12

20

4

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
88
Bidding Soon
973
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

Bordell Rd, Smethport, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.