BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2025 at 8:00 PM

Updated April 4, 2025

Renovation of an educational facility in Green Bay, Wisconsin. Completed plans call for the renovation of a educational facility.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of: completely removing the 56,560 SF built-up roofing system, metal roof edges, flashing, and foam insulation down to the structural deck; and replacing all roofing materials including a minimum of 5-inches of tapered, rigid foam insulation to achieve an R-25 insulation value, a new fully adhered membrane roofing system, new metal roof edges, and flashing. Remove and reinstall roof drain strainers as required to install new roofing. Removal and replacement of metal wall panels. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. ** bid date info : Sealed bids will be received as follows, before the time indicated above: PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) submitted via online l (this is the preferred method) ** Online bid open info : https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NmIxOWU2MzEtODJkNi00ZDFiLThiOTYtYTZiMjM0MzNjZDU5%40thread.v2%2F0%3Fcontext%3D%257B%2522Tid%2522%3A%2522f4e2d11c-fae4-453b-b6c0-2964663779aa%2522%2C%2522Oid%2522%3A%252216987bcd-db9d-4075-aa58-5b60d229f4e3%2522%257D%26anon%3Dtrue&type=meetup-join&deeplinkId=cb69a3b1-65cd-460e-a217-503b0fc5611f&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

Award

Educational

$1,340,463.00

Public - State/Provincial

Renovation

10

13

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
26
Bidding Soon
435
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 28, 2025

Project location map

2420 Nicolet Dr, Green Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.