BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2025 at 8:00 PM

Updated March 26, 2025

Renovation of a mixed-use development in Aiken, South Carolina. Completed plans call for the renovation of a educational facility.

Performance and Labor/Materials (Payment) Bonds along with notarized Power of Attorney will be required. Question Deadline 03/06/2025 at 11:00 AM ET The Bidder's shall promptly notify Jeremiah Jones at (803) 645-9084, jjones2@acpsd.net or Beth Clark at (803) 642-0436 bclark@acpsd.net of any ambiguity, inconsistency, or error, which may be discovered upon examination ofthe bidding documents, or site conditions. A Bid Bond or Certified Check for five percent (5%) of the base bid will be required. A valid Certificate of Insurance must also be submitted with the bid. The Owner reserves the right to reject any and/or all bids and to waive all technicalities and formalities. No bid may be withdrawn for a period of sixty (60) days after opening. All CMU and drywall walls sand and/abrade and spot prime areas where finish coat has peeled. Prior to first coat of primer or finish coats, substrates must be dry and free of all dusts, adhesives, tape, and soapy residue. Inspect areas ready for first coat with owner. 2. Prep all walls to be painted to include caulking, glazing, sanding, scraping of any loose paint and runs, cleaning, sealing, patching or repairing of holes, cracks, joints, and control joints at all CMU and drywall walls, windows, doors, frames, ceilings, lockers, ductwork, handrails, canopies, etc. Remove all tape, glue, wax adhesive, rust, spider webs, dirt, nails, screws anchors, etc. from all areas to be painted. 2. Prep all walls to be painted to include caulking, glazing, sanding, scraping of any loose paint and runs, cleaning, sealing, patching or repairing of holes, cracks, joints, and control joints at all CMU and drywall walls, windows, doors, frames, ceilings, lockers, ductwork, handrails, canopies, etc. Remove all tape, glue, wax adhesive, rust, spider webs, dirt, nails, screws anchors, etc. from all areas to be painted. 3. All CMU and drywall walls sand and/abrade and spot prime areas where finish coat has peeled. Prior to first coat of primer or finish coats, substrates must be dry and free of all dusts, adhesives, tape, and soapy residue. Inspect areas ready for first coat with owner. 1. The interior cleaning of all walls or surfaces to be painted with TSP. (Test existing surface to determine if existing surface is oil or latex.) 1. The interior cleaning of all walls or surfaces to be painted with TSP. (Test existing surface to determine if existing surface is oil or latex.) DIVISION 1 - GENERAL REQUIREMENTS Section 01010 - General Summary

Award

Educational

$387,334.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

April 11, 2025

Project location map

Multiple Locations, Aiken, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.