BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Site work and paving for a sidewalk / parking lot in Aiken, South Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Hopelands Gardens Sidewalk Replacement and Addition Technical questions should be directed to Aaron Campbell at (803) 642-7704. Questions concerning bid procedures should be directed to the Purchasing Coordinator, George Grieve at (803) 642-7787. Written questions should be directed to the Purchasing Coordinator at The City of Aiken, P.O. Box 1177, Aiken, SC 29802. Note- Respondents interested in being considered for this work should respond with one [1] original and three [3] copies of this submittal form along with the bid form no later than 2:00 p.m. on Thursday, March 27, 2025 and must clearly be marked "Hopelands Gardens Sidewalk Replacement / Addition." Any submittal received after this date and time will not be considered and will be returned unopened to the firm. The submittal must be signed by an official authorized to bind the firm to the project. The submittal must contain all of the evaluation criteria listed in the RFB. Return this signed form with Bid Form Must include an original copy signed in blue ink by a person duly authorized to legally bind the person, partnership, company, or corporation submitting the Qualifications. Hopelands Gardens Sidewalk Replacement 39' x 5' The contractor will furnish all materials, labor and expansion joints to construct concrete slab. Concrete will be poured 4" thick. Aggregate must be Haygood river rock and concrete dye is Desert Tan. Strength of concrete will be 3,000 psi. All site work to achieve proper elevation is to be included in price. All debris will be removed from job site upon completion. Hopelands Gardens Sidewalk Replacement 86' x 5' The contractor will furnish all materials, labor and expansion joints to construct concrete slab. Concrete will be poured 4" thick. Aggregate must be Haygood river rock and concrete dye is Desert Tan. Strength of concrete will be 3,000 psi. All site work to achieve proper elevation is to be included in price. All debris will be removed from job site upon completion. Included are 2 brick sections and grout repair. Hopelands Gardens Sidewalk Replacement and Addition 12'6" x 8' 45' x 5' 176' x 6' 78' x 6' The contractor will furnish all materials, labor and expansion joints to construct concrete slab. Concrete will be poured 4" thick. Strength of concrete will be 3,000 psi. Aggregate must be Haygood river rock and concrete dye is Desert Tan. All site work to achieve proper elevation is to be included in price. All debris will be removed from job site upon completion. . Included are 2 brick sections and grout repair.

Award

Sidewalks / Parking Lot

$32,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
75
Bidding Soon
792
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 26, 2025

Project location map

135 Dupree Pl, Aiken, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.