Published February 28, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Germantown, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Village of Germantown hereby gives notice that bids shall be received for the High Point Pass Roadway Construction Project, from Holy Hill Road to the Wisconsin and Southern Railroad. The following are approximate quantities of some of the items that will be included in the bid. Final items and estimated quantities will be listed in the bid sched-ule: Excavation Common 4,400 CY Borrow 15.000 CY Base Aggregate Dense 14-Inch 6,830 HMA Pavement 3 MT 58-28 S (3" Binder Layer) 1,260 HMA Pavement 4 MT 58-28 S (2" Surface Layer) 840 TON Asphaltic Surface (Paths) 370 Asphaltic Surface Driveways and Field Entrances 40 Concrete Curb & Gutter 30-Inch Type D 3,700 LF Concrete Sidewalk 5-Inch 810 SF Curb Ramp Detectable Warning Field Natural Patina 143 SF Concrete Driveway 6-Inch 146 SY Concrete Median Sloped Nose 155 SF Traffic Control 1 LS Erosion Control & Restoration 1 LS Trees 36 EACH Pavement Marking & Signing 1 LS Culvert Pipe Reinforced Concrete Class III 30-Inch 71 LF Apron Endwalls for Culvert Pipe Rein-forced Concrete 4 EACH Storm Sewer Pipe Reinforced Concrete Class III 24-Inch 453 LF Storm Sewer Pipe Reinforced Concrete Class IV 15-Inch 193 LF Storm Sewer Pipe Reinforced Concrete Class IV 24-Inch 636 LF Storm Sewer Pipe Reinforced Concrete Class IV 30-Inch 37 LF Storm Sewer Pipe Reinforced Concrete Class V 12-Inch 214 LF Storm Sewer Pipe Reinforced Concrete HE-III 29x45-Inch 86 LF Catch Basins 4-FT Diameter with Frame & Grate 1 EACH Catch Basins 2x3-FT with Frame & Grate 18 EACH Manholes 4-FT Diameter with Cover 10 EACH Water Main 8-Inch 1,450 LF Gate Valves 8-Inch 4 EACH Hydrant Assemblies 4 EACH Relocate Hydrant 1 EACH Water Services 200 LF Traffic Signals and Lighting Holy Hill Road & High Point Pass 1 LS Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the Owner in an amount of five (5) percent of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 15 days after the Award, the Bid Security shall be forfeited to Owner as liquidated damages The Owner has the right to reject any and/or all bids received, to waive any minor defects or irregularities that may be found in the bids, and to accept the bid that is in the best interest of the Owner. Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price.

Bid Results

Roads / Highways

$2,178,583.00

Public - City

Paving, Site Work

87

13

16

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Joint Protection
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Base Courses, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
79
Bidding Soon
1,380
All Active Projects
576
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 1, 2025

img_map_placeholder

Multiple Locations, Germantown, WI

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

High Point Pass Road Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.