EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 26, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Morrisville, North Carolina. Completed plans call for the renovation of a municipal facility.

The Town of Morrisville, NC (hereinafter referred to as the "Town") is soliciting proposals from qualified vendors for the purpose as described below: This project is about the removal and replacement of the existing roof materials on a flat roof and shingled roof on the Morrisville Connector Building located at 240 Town Hall Drive, Morrisville, NC 27560. The Town reserves the right to award contract(s) to one or more vendors, as determined to be in the best interest of the Town. The Town of Morrisville is in Wake County, equal distance from Raleigh and Durham. The Town has an estimated population of just over 30,000 and growing. Development in the Town consists of a variety of residential, commercial, industrial and mixed-use developments. With a population of just 1,022 in 1990, much of Morrisville's development has occurred in the last 25 years. The Morrisville Connector Building has two roof types: a flat EPDM roof approximately 1,194 sq. ft. which is surrounded by a shingled roof approximately 5,021 sq. ft. Both roofs are approximately 25 years old. This project will replace both these roofs. The following picture illustrates the location of the Morrisville Connector Building. The flat roof on the Connector Building is a single ply EPDM system that is approximately 25 years old and is 1,194 sq. ft. in area. This part of the project requires: _ Tearing off existing membrane and disposing of properly. _ Removing and replacing damaged /wet insulation with same, up to 200 SF. (If the damaged insulation exceeds 200 SF, a change order will be issued.) _ Installing cover board - glass-mat-faced gypsum panel, primed, ASTM C1177/C1177M, with a thickness of 1/2 inch (12 mm.). _ Mechanically attach a .36 mil Fibertite system. _ Upon Completion, provide at least a 20-year manufactures warranty and a 5-year workmanship warranty. _ Provide a 6-month, 1-year and 5-year inspection of the roo Question Deadline 02/26/2025 at 5:00 PM ET Questions related to this RFP should be sent to Bids@morrisvillenc.gov

Post-Bid

Municipal

$260,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Wood Shingles

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
89
Bidding Soon
1,205
All Active Projects
563
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

April 2, 2025

img_map_placeholder

240 Town Hall Dr, Morrisville, NC


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Connector Building Roof Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.