EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Madison, New Jersey. Completed plans call for the renovation of a educational facility.

Unit Ventilator Replacements at the Torey J. Sabatini Elementary School Any bid submitted under the terms of the New Jersey statutes not including a copy of a valid and active prequalification/classification certificate on behalf of the Bidder and all general construction contractors and subcontractors required to be named by New Jersey law may be rejected as nonresponsive to the bid requirements and /or nonresponsible. Pursuant to N.J.S.A. 18A-26, in order to be eligible to submit a Bid for the Project, the Bidder, or its Subcontractor, shall be classified by the New Jersey Department of Treasury, Division of Property Management and Construction in the following discipline: C032: HVACR Bids must be submitted on the Proposal Forms in the manner designated, enclosed in a sealed envelope bearing the name and address of Bidder, and Proposal Identification Number on the outside, and must be accompanied by Certified Check, Cashier's Check or Bid Bond drawn to the Order of the Board of Education, for not less than ten percent (10%) of the amount of the Bid, but in no case in excess of twenty thousand dollars ($20,000.00); and must be delivered to the Business Administrator/Board Secretary, or the Board's designated Representative at the above place, on or before the hour named. The Board of Education and Architect/Engineer assume no responsibility for Bids mismailed or misdirected. Each Bidder shall submit with its Bid, a Certificate of Consent of Surety, as per N.J.S.A 18A:18A-25 from a Surety Company stating that it will provide the Bidder, and all Subcontractors, if successful, a Performance/Payment Bond in the full amount of the Contract. If Bidders are not providing Surety for subcontractors, then the subcontractor must provide their own surety and proof of the same at the time of the bid submission. No Bid may be withdrawn for a period of sixty (60) days after the date set for the opening thereof. The Board of Education reserves the right to reject any and all Bids, or to waive informality in the Bidding, if it is in the interest of the Board of Education to do so. The Contracts will be awarded to the lowest responsible Bidder. Bidding shall be in conformance with the applicable requirements of N.J.S.A 18A:18A-1 et.seq. pertaining to the "Public School Contract Laws" and N.J.S.A. 18A:7G-1 et seq. pertaining to the "Educational Facilities Construction and Financing Law." The Bidders' attention is directed to the fact that all Applicable Federal, State, and Municipal Laws, and Ordinances, Rules and Regulations, including N.J.S.A. 10:5-31 et seq., and N.J.A.C. 17:27-1.1 et seq. regarding Affirmative Action, of all authorities having jurisdiction over construction work in the locality of the project, shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as if set forth therein at length, including, but not limited to, those laws identified in the INSTRUCTION TO BIDDERS. The Board Reserves the Right to Reject Any or All Bids Pursuant to N.j.s.a. 18a:18a-1 Et Seq., and to Also Not Award a Contract for Any Portion of the Project, in Whole or in Part, if the Board Has Not Obtained the Requisite Approval for the Project or Any Portion Thereof From the Appropriate State Agency. The Board Reserves the Right to Terminate the Contract if the Board Has Not Obtained the Requisite Approval for the Project or Any Portion Thereof From the Appropriate State Agency. No Bid Will Be Accepted That Does Not Conform to the Specifications Furnished. On drawing M-1.1 a new unit ventilator is shown on the lower level in the Music Room. This unit ventilator and all associated work with this unit ventilator shall be deleted from the project. • All construction note 4 shown at the new unit ventilators should be removed as it does not apply to this location. • The contractor shall run three (3) new circuits from the 120/208V electrical panel on the second floor (in closet adjacent to the nurses room) to the new receptacles and lights on the roof at the condensing units. The existing roof is NOT under warranty. The existing roof is a built-up roof

Award

Educational

$1,447,555.00

Public - City

Renovation

8

14

2

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Execution, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
318
Bidding Soon
5,265
All Active Projects
2,269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

June 23, 2025

img_map_placeholder

359 Woodland Rd, Madison, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Unit Ventilator Replacements at the Torey J. Sabatini Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.