BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2025 at 8:00 PM

Updated March 15, 2025

Site work for a playground / park / athletic field in Toledo, Ohio. Completed plans call for site work for a playground / park / athletic field.

In general, the improvements for which bids are requested will consist of the following: Improvements to the tennis courts located at the corner of Van Dusen Way and Evergreen Road in Ottawa Hills, Ohio. Project includes removal of the existing asphalt surface, regrading existing stone base, placement of new asphalt pavement, applying new acrylic surface system, and site restoration. The estimate for the cost of construction is $334, 125. Each bid must be accompanied by a Bid Guaranty in the form of either a Bid Guaranty and Contract Bond for the full amount of the bid (including all add alternates) or a certified check, cashier's check, or an irrevocable letter of credit in an amount equal to 10% of the bid (including all add alternates), as described in the Instructions to Bidders. After the award of the contract let by competitive bid and prior to the time the contract is entered into, bidders shall submit the affidavit required under Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent personal property taxes in Lucas County, Ohio. Bidder must have previous experience successfully completing a minimum of five (5) asphalt tennis courts (or similar asphalt athletic courts) within the last ten (10) years. This is a prevailing wage project. No Bidder may withdraw its bid within sixty (60) days after the bid opening. The Owner reserves the right to waive irregularities in bids, to reject any or all bids, and to conduct such investigation as necessary to determine the lowest and best responsible bidder(s) The Contractor shall provide a one-year maintenance bond in the amount of 25% of the construction cost upon completion of the project. The cost of the maintenance bond shall be included with the lump sum bid.

Bid Results

Playgrounds / Parks / Athletic Fields

$165,000.00

Public - City

Site Work

9

15

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
315
Active Projects
140
Bidding Soon
2,394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

April 7, 2025

Project location map

2532 Evergreen Rd, Toledo, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.