BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 28, 2025

Renovation of a clubhouse / community center in Trenton, New Jersey. Completed plans call for the renovation of a clubhouse / community center.

DESCRIPTION OF PROJECT Roofing replacement and parapet wall and cornice restoration and repairs AT The Carver Youth and Family Center, 10 Fowler Street, Trenton, NJ, 08618. Contractors must be qualified in historic preservation, Cold Fluid Applied Membrane Roofing and Masonry Restoration. CDBG PROJECT This project is being paid for, in part, with CDBG funds from the US. Dept. of Housing and Urban Development. Prevailing wages established under the Davis-Bacon Act will apply to this contract. The contract documents contain requirements addressing prevailing labor wage rates, labor standards, nondiscrimination in hiring practices, goals for minority and female participation, MBE and WBE participation, participation by Section 3 residents and businesses, and related matters. The benchmarks to be met are Section 3 Workers: 25 percent or more of the total number of labor hours worked by all workers on a Section 3 Project. Targeted Section 3 Workers (persons residing in subsidized housing): 5 percent or more of the total number of labor hours worked by all workers on a Section 3 project. All bidders must submit documentary evident that outreach was made to Section 3, Minority and Women Business Enterprises (MBE/WBE) to perform as subcontractors on the job. Any questions concerning this solicitation must be submitted in writing on or before the question-and-answer period, as outlined in the bid documents. Failure to do so shall result in the rejection of your submission. Photos from the aerial survey can be found HERE A 3D model of the roof can be found HERE Roof probes were opened during the design phase, the finding can be found HERE Proposers are required to comply with the requirements of P.L. 1975, c127(N.J.A.C.17:27 et seq). ON SITE QUESTIONS BY: APRIL 10, 2025, to igarcia@trentonnj.org LIQUIDATED DAMAGES: $500.00 Per Day Estimated Project Completion: 200 Calendar Days From Notice to Proceed

Bid Results

Clubhouse / Community Centers

$2,941,477.00

Public - City

Renovation

28

19

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
878
Active Projects
312
Bidding Soon
7,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

Project location map

40 Fowler St, Trenton, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.