EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Indianapolis, Indiana. Completed plans call for site work for a road / highway; and water / sewer project.

Range: $2,250,000 - $3,000,000 This Work will be funded by the City of Indianapolis. The participation goal for Minority Business Enterprise (MBE) for this contract is fifteen percent (15%). The participation goal for Women Business Enterprise (WBE) for this contract is eight percent (8%). The participation goal for Veteran Business Enterprise (VBE) is three percent (3%). The participation goal for Disability-owned Business Enterprise (DOBE) is one percent (1% Question Deadline 02/20/2025 at 12:00 PM ET Questions should be submitted to Katherine Kreienkamp via email at Katherine.Kreienkamp@indy.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Site Work

84

17

12

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Field Quality Control Procedures, Temporary Facilities and Controls, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Sawing Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
69
Bidding Soon
685
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 28, 2025

img_map_placeholder

Keystone Ave, Indianapolis, IN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Keystone Avenue over Howland Ditch and Bailey Creek

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.