BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2025 at 7:00 PM

Updated February 20, 2025

This is a service / maintenance or supply contract in Nevada City, California. Contact the soliciting agency for additional information.

The County of Sierra (County) is seeking to engage a qualified Consultant to provide Construction Inspection and Materials Testing services during construction of the following project: The project provides for the installation of aa new one-lane bridge on Plumbago Road over Kanaka Creek, 2 miles Southeast of Alleghany. Work consists of installation of a new one-lane bridge, earthwork, construction of Retaining walls, temporary and permanent erosion control concrete foundations, grading, roadway construction, in accordance with approved plans and specifications. In addition to the construction requirements, this project involves work in the Waters of the United States and wetland areas. The County has obtained the necessary 401, 404 and 1600 permits required for the project, copies of which are attached to this solicitation. The successful consultant will be required to ensure the contractor's work is in compliance with the permit conditions. Selection of a Consultant will be in accordance with a "Qualifications Based Selection" process in determining which firm to hire. The consultant selection process begins with this Request for Proposal (RFP), in response to which, interested consulting firms shall submit a proposal. In the second step of the process, the proposals will be evaluated using the Selection Process Criteria outlined below. Highly ranked consultant teams may be selected for interviews. The County intends to begin the construction for the Plumbago Road Bridge Replacement Over Kanaka Creek in the Spring of 2025. The Project is Federally Funded; therefore, consultants need to comply with requirements of the Caltrans Local Assistance Procedures Manual (LAPM). The County has established an overall DBE participation goal of 5.3% for this project. Construction may not begin until April 1, 2025. The work must be completed within 140 working days beginning on April 1, 2025.

Conceptual

Bridges / Tunnels

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
4
Bidding Soon
815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

Project location map

Plumbago Rd, Nevada City, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.