Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 19, 2025 at 7:00 PM
Updated February 20, 2025
This is a service / maintenance or supply contract in Nevada City, California. Contact the soliciting agency for additional information.
The County of Sierra (County) is seeking to engage a qualified Consultant to provide Construction Inspection and Materials Testing services during construction of the following project: The project provides for the installation of aa new one-lane bridge on Plumbago Road over Kanaka Creek, 2 miles Southeast of Alleghany. Work consists of installation of a new one-lane bridge, earthwork, construction of Retaining walls, temporary and permanent erosion control concrete foundations, grading, roadway construction, in accordance with approved plans and specifications. In addition to the construction requirements, this project involves work in the Waters of the United States and wetland areas. The County has obtained the necessary 401, 404 and 1600 permits required for the project, copies of which are attached to this solicitation. The successful consultant will be required to ensure the contractor's work is in compliance with the permit conditions. Selection of a Consultant will be in accordance with a "Qualifications Based Selection" process in determining which firm to hire. The consultant selection process begins with this Request for Proposal (RFP), in response to which, interested consulting firms shall submit a proposal. In the second step of the process, the proposals will be evaluated using the Selection Process Criteria outlined below. Highly ranked consultant teams may be selected for interviews. The County intends to begin the construction for the Plumbago Road Bridge Replacement Over Kanaka Creek in the Spring of 2025. The Project is Federally Funded; therefore, consultants need to comply with requirements of the Caltrans Local Assistance Procedures Manual (LAPM). The County has established an overall DBE participation goal of 5.3% for this project. Construction may not begin until April 1, 2025. The work must be completed within 140 working days beginning on April 1, 2025.
Conceptual
Bridges / Tunnels
Public - County
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
Plumbago Rd, Nevada City, CA
Related To This Project
Nevada City, CA
--
Nevada City, CA
Bid Date: Apr 16 2025
Nevada City, CA
Bid Date: May 20 2025
Nevada City, CA
Bid Date: Apr 10 2025
Nevada City, CA
Bid Date: May 01 2025
Nevada City, CA
--
Nevada City, CA
Bid Date: May 26 2025
Nevada City, CA
--
Nevada City, CA
Bid Date: Feb 07 2025
Nevada City, CA
--
Nevada City, CA
Bid Date: Jan 15 2025
Nevada City, CA
Bid Date: Jan 23 2025
Nevada City, CA
Bid Date: Oct 24 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
