Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 5, 2025 at 7:00 PM
Updated March 6, 2025
Site work for a road / highway in Fairfield, Ohio. Completed plans call for site work for a road / highway.
2025 Pavement Marking Program The Notice to Proceed shall be issued within thirty (30) days of the execution of the Agreement by the Owner. Bid Bond (Certified Check or Cashier's Check for ten percent (10%) of the amount of the bid submitted unless otherwise specified) A Performance bond and a Payment Bond, in the amount of one hundred percent (100%) of the Contract Price with a corporate surety approved by the Owner, will be required for the faithful performance of the Contract. Bid prices must be firm for a period of ninety (90) days following the bid opening date. The Contractor shall guarantee all materials and equipment furnished and Work performed for a period of one (1) year from the date of Substantial Completion. The Contractor warrants and guarantees for a period of one (1) year from the date of Substantial Completion of the system that the completed system is free from all defects due to faulty materials or workmanship and the Contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs of any damage to other parts of the system resulting from such defects. The Owner will give notice of observed defects with reasonable promptness. In the event that the Contractor should fail to make such repairs, adjustments, or other Work that may be made necessary by such defects within two (2) working days after receiving notice from the City or within that time as may be allowed by the City, the Owner may do so and charge the Contractor the cost thereby incurred. Notice may be by phone or letter to the Contractor. The Contractor will be responsible for defective materials and must replace defective materials at the Contractor's cost. The performance Bond shall remain in full force and effect through the guarantee period The City of Fairfield reserves the right to reject any or all bids or to correct or waive irregularities in bids should it be deemed in the best interest of the City to do so. The Owner may waive any informalities or minor defects or reject any and all Bids. Any Bid may be withdrawn prior to the above scheduled time for the opening of the Bids or authorized postponement thereof. Any Bid received after the time and date specified shall not be considered. No Bidder may withdraw a Bid within ninety (90) days after the actual date of the opening thereof. Should there be reasons why the Contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder.
Bid Results
Roads / Highways
$101,457.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2025
April 2, 2025
Multiple Locations, Fairfield, OH
Related To This Project
Fairfield, OH
Bid Date: Mar 10 2025
Fairfield, OH
Bid Date: Jun 23 2025
Fairfield, OH
--
Fairfield, OH
Bid Date: Jun 30 2025
Fairfield, OH
--
Fairfield, OH
--
Fairfield, OH
--
Fairfield, OH
Bid Date: Oct 31 2025
Fairfield, OH
Bid Date: Mar 13 2025
Fairfield, OH
Bid Date: Feb 14 2025
Fairfield, OH
Bid Date: Feb 24 2025
Fairfield, OH
--
Fairfield, OH
Bid Date: Dec 15 2025
Fairfield, OH
Bid Date: Feb 10 2025
Fairfield, OH
Bid Date: Feb 13 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed