BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Site work for a water / sewer project in Biloxi, Mississippi. Completed plans call for site work for a water / sewer project.

As of April 8, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Parker Creek Dredging for the following: Parker Creek Dredging Project No. 1097 Upon request, a copy of the full advertisement will be available at the following locations: Purchasing Office, 140 Lameuse Street, Biloxi MS (228-435-6252) Biloxi Public Library, 580 Howard Avenue, Biloxi MS (228-436-3095) Donal Snyder Community Center, 2520 Pass Road, Biloxi MS (228-388-1340). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work shall consist of furnishing all labor, supervision, bonds, insurances, materials, plant, tools and equipment, for performing all operations necessary in conjunction with the mechanical dredging of Parkers Creek. All work shall be completed in strict accordance with the plans & specifications, all federal, state & local regulations and permitted conditions. All sediment shall be disposed of at the Harrison County Development Commissions Dredged Material Spoil Disposal Area C and / or C-1. Contractor shall adhere to all provisions of Section 2 of these Technical Specifications. The project consists of removing and disposal of accumulated sediment within the following identified segments of channel as outlined in the plans and specifications: 1. Alignment A – Station 0+00 to 10+30 with a channel width of 15 feet wide at a depth of -7.0 feet mean low water with 3:1 side slopes. 2. Alignment B – Station 10+30 to 26+15 with a channel width of 20 feet wide at a depth of -7.0 feet mean low water with 3:1 side slopes. All work shall be in strict accordance with the plans & specifications, all federal, state and local regulations and permitted conditions. Construction oversight, bid recommendations, and answers to bid questions will be provided by Seymour Engineering. The Engineer for this project is Edward L (Ned) Hogg, P.E., and can be reached at nhogg@seymoureng.com. Jody Spires is the lead designer and is also available to answer questions. He can be reached at jspires@seymoureng.com. The resident project representative for this project has not yet been assigned.

Bid Results

Water / Sewer

$206,425.00

Public - City

Site Work

8

5

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
124
Bidding Soon
839
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

April 18, 2025

Project location map

To Be Determined, Biloxi, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.