EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2025 at 8:00 PM

Updated October 1, 2024

Demolition, site work, new construction and addition to a mixed-use development in Marion, Ohio. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

Build one new Addition, Elementary school for 477 students in grades K-4, to the Existing New Middle/High School The building addition is to be approximately 52,774 SF with a total co-funded budget of $20,826,816 (Master Plan). Total Project Cost: $21,089,663. This project's master plan is based on a 2024 cost set. This project has the following allowances: o Emergency Responder Radio Coverage System for 52,774 SF: $68,606.20 (which is included above). o Enhanced ADA Playground Surface: $187,960.50 (which is included above). o There is one partial Demolition/Abatement of the academic wing of the original existing Pleasant High School with an estimated budget of $262,847.00 to occur after the construction of the new school is completed. o This project will follow LEED v4.0 criteria and be registered for LEED v4.0 Silver. Should the AE team not be experienced in LEED v4.0, the AE is expected to hire a consultant that is qualified. o The project will be designed in accordance with the Ohio Schools Design Manual. o Contracting authority has designated 18 months as a construction duration. Please note the CMR has an opportunity to shorten that duration. The anticipated schedule below includes construction duration for the new building addition only. Demo will follow new construction. o The architect will not be responsible for managing the finances on this project. o There is an opportunity for non-integral locally funded initiatives that will be outside the co-funded scope of the project, but related to the project and will be the subject of a separate contract with the chosen vendor. This scope includes a close up of the original Pleasant High School ("Button Up") and other possible scopes that are not contemplated at this time. o The project agreement is expected to be fully executed in March 2025. Substantial Completion of all Work: 06 / 27 Submit all questions regarding this RFQ in writing to Procurement at procurement@ofcc.ohio.gov

GC Bidding

Educational

$21,089,663.00

Public - State/Provincial

Addition, Demolition, LEED Certification, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
93
Bidding Soon
1,415
All Active Projects
615
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

January 1, 2026

img_map_placeholder

1117 Owens Rd W, Marion, OH


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ CM at Risk - Pleasant Local Schools, New K-4 addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.