EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Marion, Ohio. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

MAR-CR26-20.63 Bridge Rehabilitation Project Question Deadline 02/14/2025 Every request for such interpretation should be in writing and to be given consideration, must be received at least five (5) days prior to the date fixed for the opening of bids Engineer's Estimate: $528,976.54 All bids shall be sealed and plainly marked "SEALED BID FOR MARCR26-20.63 Bridge Rehabilitation Project." Bid shall be accompanied by a Bid Security in the form of a bid bond in the amount of one hundred percent (100%) of the bid or a certified check in the amount of ten percent (10%) of the bid. In addition to the Bid Security, a Performance Bond is required for this project in the amount of one hundred percent (100%) of the total project cost and may be submitted with the Bid Proposal. The Owner requires that all work associated with the project be completed before October 31st, 2025. Bidders must be pre-qualified as a Contractor by the Ohio Department of Transportation. This is a Federal-Aid project, and the Federal Equal Employment Opportunity regulations listed in the proposal shall govern. There is an 8% Disadvantaged Business Enterprises (DBE's) participation goal on this contract. This is a prevailing wage contract in accordance with the U.S. Department of Labor Regulations, Title 29, Subtitle A, Part 5, Sections 5.5, 5.31, and 5.32, most recent revision at contract execution. Bidders shall comply with all applicable provisions. Disadvantaged Business (DBE) Requirement. DBE participation goals (Subcontracts, materials, supplies) have been set on this project for those certified as DBE's in accordance with the TEA - 21 (1998) and 49 CFR, Part 26, and qualified to bid with ODOT under Chapter 5525 of the Ohio Revised Code (O.R.C.). The DBE goal designation is stated at the beginning of the project proposal, following the project identification. No bids shall be withdrawn for a period of sixty (60) days after the opening thereof. Awarding of the contract shall be to the Lowest and Best bidder as determined by the Marion County Board of Commissioners in the best interest of Marion County. The Board reserves the right to reject any or all bids.

Bid Results

Bridges / Tunnels

$407,727.00

Public - County

Paving, Site Work

18

5

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
93
Bidding Soon
1,415
All Active Projects
615
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

June 1, 2025

img_map_placeholder

Multiple Locations, Marion, OH


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

MAR-CR26-20.63 Bridge Rehabilitation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.