EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Corpus Christi, Texas. Completed plans call for site work for a transportation facility; and water / sewer project.

The Port of Corpus Christi Authority (PCCA) hereby issues this Request for Bids (RFB) seeking Bidders interested in the Bulk Dock 1 Maintenance project. Scope of work generally consists of concrete spalling repairs, cracking repairs, replacement of bull rail, refurbishing of mooring bollards, and cleaning of the crane rail. This work is to occur on above water structure near the waterline. Clarification Deadline 3/19/2025 5:00 PM Bids Open 03/20/2025 at 3:00 PM CT Online Bid Opening - Bid Open via Microsoft Teams meeting: Dial in by phone +1 361-360-0693,,415477526# United States, Corpus Christi Find a local number Phone conference ID: 415 477 526# For organizers: Meeting options | Reset dial-in PIN Pre-Bid Meeting 02/21/2025 at 10:00 AM CT Virtual Attendance Via Microsoft TEAMS Meeting Dial in by phone +1 361-360-0693,,885176709# United States, Corpus Christi Find a local number Phone conference ID: 885 176 709# For organizers: Meeting options | Reset dial-in PIN

Post-Bid

Water / Sewer

$2,200,000.00

Public - City

Site Work

3

35

12

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings, Marine Coatings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
208
All Active Projects
103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

May 20, 2025

img_map_placeholder

Multiple Locations, Corpus Christi, TX

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bulk Dock 1 Maintenance

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.