Published March 14, 2025 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Birmingham, Alabama. Completed plans call for site work for a water / sewer project.
The Work consists of, but is not limited to the installation of approximately 3,385’ of 8” DICL “Zinc Coated” pipe; 3,225’ of 6” DICL “Zinc Coated” pipe; 220’ of 4” DICL “Zinc Coated” pipe; and 101 water services and other miscellaneous associated items as necessary to complete the Work along 14th Avenue North; 3rd Street North; 13th Court North; 3rd Place North; 4th Place North; 15th Avenue West; 1st Street West; and 16th Avenue West located in the City ofBirmingham, Alabama. Each Prospective Bidder shall read and understand the Alabama Department of Revenue's (ADOR's) sales and use tax exemption policy pursuant to Act 2013-205 Section 1(g) [CONTRACTOR accounts for the sales tax not included in the Bid Form by submitting an Accounting of Sales Tax -Attachment to BWWB Bid Form], Failure to provide an accounting of sales tax shall render the Bid non-responsive. Other than determining responsiveness, sales tax accounting shall not affect the bid pricing nor be considered in the determination of the lowest responsible and responsive bidder. After Notice of Award, Prime Contractor and Subcontractor(s) licensed by the State Licensing Board for General Contractors must comply with ADOR reporting requirements for the duration of the project. For further information see Section 00409, Alabama Department of Revenue-Sales and Use Tax Exemption, Section 00200 Instruction to Bidders (Article 33) and refer to paragraph 6.10 in the Supplementary Conditions. No Bidder may withdraw or alter his bid within ninety (90) calendar days after the actual date of the Bid Opening. Each Bid shall be accompanied by a certified check or Bid Bond in the amount of five percent (5%) of the bid not to exceed $10,000.00 in the form and subject to conditions provided for in Section 00435, Bid Bond. The Successful Bidder will be required to furnish a Performance Bond and a Labor & Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Award. It is the intent of the BWWB to foster competition among contractors, suppliers and vendors that will result in better quality and more economical services for the BWWB. Under this program, the BWWB has established a goal of 30% participation of HUB firms for services required for BWWB construction projects. The BWWB's stated goal will not be the determining factor in construction contract awards; rather bidders must demonstrate compliance with the Good Faith Efforts, more particularly outlined in the HUB Program, toward meeting said goal. If a Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder, who has neither been disqualified nor rejected pursuant to these Contract Documents, and whose Bid based on an evaluation by the OWNER indicates that the award will be in the best interest of the project and will result in the lowest overall cost to the OWNER for completion of the project. Unless extended by OWNER, a Contract will be awarded within ninety (90) calendar days after the day of the opening of Bids. The OWNER reserves the right to reject any and all proposals, the right to waive irregularities or to accept any proposal deemed to be in the best interest of the OWNER.
Post-Bid
Water / Sewer
$300,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
April 14, 2025

Multiple Locations, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Mar 13 2025
Birmingham, AL
Bid Date: Feb 27 2025
Birmingham, AL
Bid Date: Mar 20 2025
Birmingham, AL
Bid Date: Mar 12 2025
Birmingham, AL
Bid Date: Mar 06 2025
Birmingham, AL
Bid Date: Mar 18 2025
Birmingham, AL
Bid Date: Apr 03 2025
Birmingham, AL
Bid Date: Feb 25 2025
Birmingham, AL
Bid Date: Mar 18 2025
Birmingham, AL
Bid Date: Mar 19 2025
Birmingham, AL
Bid Date: Mar 12 2025
Birmingham, AL
Bid Date: Mar 11 2025
Birmingham, AL
--
Birmingham, AL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.