Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 12, 2025 at 8:00 PM
Updated May 13, 2025
Renovation of an educational facility in Birmingham, Alabama. Completed plans call for the renovation of a educational facility.
The project includes the replacement of select roof areas and re-covering of other roof areas totaling approximately 69,000 square feet at UAB Volker Hall. For the areas noted to be replaced in the Project Documents, the scope of work includes removal of all existing roofing surfacing, roof membranes, and insulation to expose the underlying structural concrete or metal deck and installation of a new roof system consisting of new self-adhered vapor retarder (if necessary to meet project requirements) minimum LTTR-25 insulation, tapered insulation as necessary to achieve desired roof slope, cover board, and new 80 mil. PVC fully adhered roof membrane. For the areas noted to be re-covered (other than Roof Area 9), the scope of work includes preparation of the existing roof covering (including removal of aggregate surfacing) mechanically fastening a new coverboard and instllaing a new 80 mil. PVC fully adhered membrane. At Roof Area 9, existing insulated concrete pavers are to be salvaged, a new fleeceback PVC membrane installed on existing suitable substrate, and new extruded polystyrene (XPS) insulation and salvaged insulated pavers to be installed to achieve LTTR-25 minimum. Existing mechanical units, ductwork, pipes, etc. are to be supported or raised as necessary to remove and install a new roof assembly in compliance with the project documents. Raising of roof-to-wall flashings and modifications to other ancillary roof accessories (e.g. stairs and access door) are required. Drainage improvements in the scope of work include installation of two new overflow drains, associated piping, and an outlet as well as enlarging existing through wall scuppers. The scope of work also includes demolition and removal of existing mechanical screen walls, duct work, and an enclosure and roof covering constructed over original rooftop duct work. UAB Volker Hall Roof Replacement Project Prime Contractors that are properly licensed for this type of work are required to prequalify in order to bid. Prequalification submissions must be received prior to 5pm CST on March 3, 2025 ESTIMATED COST of WORK $2,500,000-$2,750,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 03/27/2025
Bid Results
Educational
$2,750,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
June 2, 2025
1670 University Blvd, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Feb 25 2025
Birmingham, AL
Bid Date: Mar 11 2025
Birmingham, AL
Bid Date: Apr 03 2025
Birmingham, AL
Bid Date: Mar 06 2025
Birmingham, AL
--
Birmingham, AL
Bid Date: Feb 28 2025
Birmingham, AL
--
Birmingham, AL
Bid Date: Mar 24 2025
Birmingham, AL
Bid Date: Mar 18 2025
Birmingham, AL
Bid Date: Mar 06 2025
Birmingham, AL
Bid Date: Mar 12 2025
Birmingham, AL
Bid Date: Jun 05 2025
Birmingham, AL
Bid Date: Feb 27 2025
Birmingham, AL
Bid Date: Mar 13 2025
Birmingham, AL
Bid Date: Mar 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
