BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Renovation of a playground / park / athletic field in Ohiopyle, Pennsylvania. Completed plans call for the renovation of a 11,529-square-foot, two-story above grade playground / park / athletic field.

Description Mechanical Construction Visitor Center HVAC Rehab Ohiopyle State Park Ohiopyle Borough, Fayette County This project will consist of selective demolition of the Biological Treatment room interior finishes and HVAC systems. Removal and reinstallation of certain items will also be necessary. New work will include insulation, air barriers and sealing off penetrations. Interior paint and repairs to existing aluminum-faced storefronts and glazed aluminum curtain walls. Installation of a new dehumidification unit with associated ductwork, new wall mounted instantaneous water heater to the heat pump loop, new supply and return water connections, valves, etc., and a new exhaust fan with pressurization control system. DGS Small Business Certification Required Engineer's Estimate: $100,000-$350,000 Question Deadline 02/24/2025 at 4:30 PM ET All questions must be received through electronically. Questions asked via email, phone, or otherwise will not be answered The right is reserved, as the interests of the Commonwealth may require, to revise or amend the Bid Documents prior to the dates set for opening of bids. Such revisions will be announced by Addenda to the Bid Documents. Copies of all such Addenda issued will be sent to all parties receiving copies of the Bid Documents and must be acknowledged with the bid. Contractor is to begin work within ten (10) days after receipt of Notice to Proceed, and to complete work within One Hundred Twenty (120) calendar days. The tenth (10th) day after receipt of Notice to Proceed shall be the official starting date unless the ten (10) day period is extended in writing by the Secretary. It is understood that if the work is not completed within the time above specified or such extension thereof, as shall be granted in accordance with the General Conditions, the Contractor shall pay the Commonwealth of Pennsylvania as liquidated damages and not as a penalty for non-completion of work, the amount of One Thousand Dollars ($1,000.00) per day for each and every calendar day thereafter until the work shall be completed and accepted. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Playgrounds / Parks / Athletic Fields

$412,000.00

Public - State/Provincial

Renovation

29

20

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
98
Bidding Soon
1,384
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

April 7, 2025

Project location map

124 Main St, Ohiopyle, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.