Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2025 at 8:00 PM
Updated May 24, 2025
Site work and paving for a sidewalk / parking lot in West Chester, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
https://www.westchesteroh.org/government/community-development/road-curb-and-stormwater-repairs View planned capital improvement projects Below is an interactive map that indicates the planned road improvement projects for West Chester Township. This map is updated annually. If you have any difficulty with the interactive map below, use the direct link here. During the 2025 construction season, West Chester’s Community Services department will invest $5,152,573 million in road and infrastructure upgrades. The investment includes $4.83 million to repair and repave 8.9 miles of roadway, $1,650,000 to repair curbs, and $390,252 to repair storm drains. In late 2024, the Community Services department evaluated the condition of roads throughout the township. Roads were rated based on their overall condition to prioritize repair and repaving for the year. 2025 Planned Capital Improvement Projects Bayer Drive, between Cardington Place to the south end Central Avenue, between 4th and 2nd Streets Cherry Lane Farm Drive, between Holly Hill Lane to the cul-de-sac Cincinnati Dayton Road, extending from last project to the I-75 bridge Club Lane, between Hunters Ridge and Dorsetshire Drives Coachlight Way, between Kennesaw Drive and Merryman Way Crescentville Road, between the bridge and Windisch Road and between Mosteller Road and Mosteller Lane Dorsetshire Drive, between Coachlight Way and the cul-de-sac Douglas Street, between 4th Street and the cul-de-sac Floral Avenue, between 2nd Street and the cul-de-sac Fountains Boulevard, between Cincinnati Dayton Road and Squirrel Hollow Ridge 4th Street, between Tylersville Road and Floral Avenue Grove Street, between 3rd and 4th Streets Hedgerow Drive, between Carey Woods Lane and the cul-de-sac Hutzelman Way, between 747 and Village Way Kenneth Street, between Douglas and 4th Streets Millrace Way, between Dorsetshire Drive and the cul-de-sac Old Stable Court, between Tylers Crossing and the cul-de-sac Runabay Circle, between Rolling Meadows Drive and the cul-de-sac 2nd Street, between Tylersville Road and Shirley Drive Shirley Drive, between 2nd Street and Twin Creek Trace Smith Road, between Tylersville Road and Wyndtree Drive (east) Stonebarn Drive, between Tylers Crossing and the cul-de-sac 3rd Street, between Tylersville Road and Grove Street Tylers Circle, between Tylers Crossing and the cul-de-sac Tylers Crossing, between Hunters Ridge Drive and Old Stable Court Tylers Way, between Tylersville Road and White Hill Lane Willow Crest Lane, between Holly Hill Lane and the cul-de-sac -------------------------------------------------------------------------------------------------------- furnishing the labor, materials and equipment necessary for the replacement of curbs at various locations in West Chester Township for the 2025 Curb Replacement Program. West Chester Township shall only award the contracts to the lowest responsive and responsible bidder pursuant to O.R.C. Section 9.312(c). In accordance with ORC 153.54, each bid must be accompanied by a bid bond, letter of credit or certified check equal to 10% of the bid. No proposals will be entertained unless submitted on bid forms furnished by West Chester Township Trustees. The Board of Trustees reserves the right to waive any irregularities, informalities and to award contracts to the bidder or bidders they deem most capable of meeting the completion dates, time being of the essence. This project will comply with all of the guidelines for prevailing wage. This project is tax exempt. Question Deadline 03/05/2025 at 10:00 AM ET
Post-Bid
Sidewalks / Parking Lot
$1,600,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
May 12, 2025
Multiple Locations, West Chester, OH
Related To This Project
West Chester, OH
Bid Date: Mar 11 2025
West Chester, OH
Bid Date: Mar 19 2025
West Chester, OH
Bid Date: Apr 25 2025
West Chester, OH
--
West Chester, OH
--
West Chester, OH
Bid Date: Dec 17 2025
West Chester, OH
Bid Date: Sep 10 2025
West Chester, OH
--
West Chester, OH
Bid Date: Mar 24 2025
West Chester, OH
--
West Chester, OH
Bid Date: Mar 04 2025
West Chester, OH
--
West Chester, OH
Bid Date: Jan 06 2025
West Chester, OH
Bid Date: Jan 27 2025
West Chester, OH
Bid Date: Dec 05 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
