BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2025 at 7:00 PM

Updated March 25, 2025

Site work for a mixed-use development in Dover, Ohio. Completed plans call for site work for a communication facility; and power facility.

NORTH END POWERLINE EXTENSION For the furnishing of all labor, specified materials, apparatus, expendable tools and equipment, and all other services required for the construction of one (1) 15 kV pole line associated with improvements to the Municipal Electric System of the City of Dover, Ohio. The base bid consists of the construction/rebuild of approximately 1.7 miles of pole line along with the relocation of existing secondary circuits. The new 15 kV dedicated pole line distribution circuit route will be from the North Intertie Substation to the new plant site located south of Crown Road Northwest and west of North Wooster Avenue. A portion of the dedicated distribution circuit will be an overbuild modification of a pole line that contains either one or two existing distribution circuit lines. Existing distribution conductors and secondary circuits will be relocated to the new poles. The existing poles will have all the circuit hardware removed. The existing poles will be topped immediately above the existing communication/fiber circuits as part of the scope of work. Replacement and new pole line sections are shown in detail on the associated drawings which describes the scope of work for the improvements to the Municipal Electric System of the City of Dover, Ohio. For technical questions please contact Joe Hulderman at jhulderman@ssoe.com or Jeremy Tausch at jtausch@ssoe.com. 2. GENERAL BID REQUIREMENTS To be responsive, all bids must include all equipment, apparatus, materials and Work necessary to be in strict conformance with the Contract Documents. 3. REJECTION OF BIDS The City of Dover, Ohio expressly reserves the right to reject any or all bids, to judge the character and sufficiency of the Work offered by the bidders, and to judge the ability of any bidder to perform the Work in a proper manner . 4. EFFECTIVE PERIOD OF BIDS No bidder may withdraw his bid for a period of ninety (90) days from the date of opening thereof. 5. BONDING REQUIREMENTS A Bid Bond executed by the bidder and a surety company in an amount equal to Ten Percent (10%) of the aggregate amount of the bid shall be submitted with each bid. In lieu of such bond, a certified check in the amount equal to that required in such bond, payable to City of Dover, Ohio may be submitted. 6. PRE-BID MEETING There is no mandatory pre-bid meeting for bidding this Contract. If you have any questions in regards to this Contract, contact SSOE engineers Joe Hulderman at (567) 218-2549 or Jeremy Tausch at (330) 248-7567.

Post-Bid

Power Plant

$500,000.00

Public - City

Site Work

26

12

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
133
Bidding Soon
2,421
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 23, 2025

Project location map

Multiple Locations, Dover, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.