Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 4, 2025 at 7:00 PM
Updated March 6, 2025
Demolition, site work and addition to an educational facility in Live Oak, Florida. Completed plans call for the addition of a 8,500-square-foot educational facility; for site work for a educational facility; and for the demolition of a educational facility.
Scorpio has been selected as the construction manager for the Riveroak Community Center located in Live Oak, FL. You are invited to submit Final Pricing based on the Bid Revisions Set documents. Subcontracts will be awarded based off this submission. It includes the construction of a 8,500 sf addition to the existing nurse education building. Specifications are located on the plans. As of February 20, 2025, the non-mandatory site-walkthrough has been scheduled for Monday February 24, 2025. There are 3 alternates related to renovating the existing building: Remodeling Room 002, Replace the Ceiling in room 005, Remodel Room 009. Alternates listed on the MEP drawings are to reflect this. Trades required include: SITE: selective demolition, sitework, landscaping STRUCTURE: cast-in place concrete, masonry, structural steel, decorative metals SYSTEMS: plumbing, HVAC, electrical SKIN: waterproofing, roofing, insulation, doors, glass & glazing, metal framing & drywall, stucco SURFACES: casework, acoustical ceilings, painting, flooring SPECIALTIES: toilet accessories, signage, window treatments The project is scheduled to start in April/May 2025 and reach final completion in 11 months. Site walkthrough day and time TBD.
Post-Bid
Educational
$3,700,000.00
Public - County
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2025
April 1, 2025
415 Pinewood Dr SW, Live Oak, FL
Related To This Project
Live Oak, FL
Bid Date: Mar 17 2025
Live Oak, FL
Bid Date: Feb 24 2025
Live Oak, FL
Bid Date: Mar 18 2025
Live Oak, FL
Bid Date: Apr 09 2025
Live Oak, FL
Bid Date: Apr 16 2025
Live Oak, FL
Bid Date: Apr 28 2025
Live Oak, FL
Bid Date: Apr 29 2025
Live Oak, FL
Bid Date: May 28 2025
Live Oak, FL
Bid Date: Feb 10 2025
Live Oak, FL
Bid Date: Feb 07 2025
Live Oak, FL
--
Live Oak, FL
Bid Date: Feb 21 2025
Live Oak, FL
Bid Date: Jul 21 2025
Live Oak, FL
Bid Date: Feb 07 2025
Live Oak, FL
Bid Date: Feb 12 2019
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
