BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Site work and new construction of a pre-engineered storage facility in Live Oak, Florida. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Suwannee County School District is seeking bids from Contractors for a new pre-fabricated 40 wide and 80 long metal storage shed. Shop drawings shall be provided and approved by SCSD before installation begins. The building shall comply with all State, Federal and local laws and ordinances. The work to be done under this contract includes, but is not limited to; providing all labor, materials, supervision, equipment, incidentals, and related items necessary to complete the work to install structure. Questions should be directed to Ethan Butts. Director of Facilities at the contact information below. Ethan Butts, Director of Facilities ethan.butts@suwannee.k12.fl.us 1729 Walker Avenue, SW Live Oak, FL 32064 386-647-4158 Suwannee County District Schools reserves the right to reject any or all bids, to waive any defects or irregularities in bids and to accept any bid which is deemed most advantageous to the public interest.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$282,305.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
14
Bidding Soon
641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 9, 2025

Project location map

To Be Determined, Live Oak, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.