EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Hopkinsville, Kentucky. Completed plans call for the renovation of a municipal facility.

Volume One: Addition of an ADA accessible toilet and laundry room as well as removal of one office and creation of two offices within the building at an existing Group Home facility. The addition is a wood framed structure on a slab on grade. Finishes include painted gypsum board and ceramic tile. Work also includes installation of a larger primary entrance door for ADA accessibility. The existing office will be removed to accommodate access to the new laundry area. Two new offices will be created within the open area for staffing needs. Building PTAC unit will be remove and replaced with a VRF system to serve the HVAC needs of the building. Volume Two: Work Area 1-Excavation & installation of a new drainage area/trench behind the existing facilities. Work to include earthwork, installation of new storm piping, concrete headwall, and drainage rock. Work Area 2 - Removal of existing & installation of a new asphalt entrance. Work to include earthwork, paving, installing new storm piping, guardrails, and concrete headwalls. NO QUESTIONS WILL BE ANSWERED AT THE SITE VISIT. ALL TECHNICAL QUESTIONS SHALL BE EMAILED TO THE ARCHITECT/ENGINEER OF RECORD FOR THIS PROJECT. ALL PROCUREMENT QUESTIONS SHALL BE DIRECTED TO BUYER OF RECORD FOR THIS PROJECT.

GC Bidding

Municipal

$439,190.00

Public - State/Provincial

Renovation

20

21

4

9

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
42
Bidding Soon
583
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

May 2, 2025

img_map_placeholder

2625 Madisonville Rd, Hopkinsville, KY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hopkinsville Group Home Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.