Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 7, 2025 at 8:00 PM
Updated May 8, 2025
Site work, paving and outdoor lighting for a mixed-use development in Champlin, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and water / sewer project.
The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 71 EACH Grubbing 31,675 S Y Remove Bituminous Pavement 7,333 L F Remove Curb and Gutter 27,554 C Y Excavation - Common (P) 8,537 C Y Aggregate Base (CV) Class 5 5,684 TON Type SP 9.5 Bituminous Mixture 3,582 TON Type SP 12.5 Bituminous Mixture 5,413 L F 15" - 24" RCP Storm Sewer 1 L S Irrigation System 6 EACH Hydrant 5,526 L F 6"-12" PVC Watermain 354 L F Construct Drainage Structure 16,841 S F 4" Concrete Walk 16,984 L F Concrete Curb and Gutter 20 EACH Lighting Unit Type Special 1 and 2 211 L F Wooden Fence 760 S F Sign 2 SYS Traffic Control Sign System 34 EACH Deciduous Tree 2" Cal B&B 6.7 ACRE Seeding 3,506 L F 4" Solid Line Multi Comp The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days. City of Champlin 11955 Champlin Drive Champlin, MN 55316 City of Brooklyn Park 5200 85 th Avenue North Brooklyn Park, MN 55443 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Direct questions about this Project to Nic Hentges at 612.360.1286 or nhentges@wsbeng.com.
Award
Roads / Highways
$6,023,094.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2025
April 21, 2025
109th Ave N, Champlin, MN
Related To This Project
Champlin, MN
Bid Date: Apr 03 2025
Champlin, MN
Bid Date: May 13 2025
Champlin, MN
Bid Date: May 20 2025
Champlin, MN
Bid Date: Aug 06 2025
Champlin, MN
Bid Date: Sep 11 2025
Champlin, MN
Bid Date: Sep 15 2025
Champlin, MN
Bid Date: Jan 06 2026
Champlin, MN
Bid Date: Apr 01 2025
Champlin, MN
Bid Date: Mar 11 2025
Champlin, MN
Bid Date: Feb 20 2025
Champlin, MN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
