BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a road / highway in North Liberty, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project ID: 250318 R1, 25-52-380-010, 25-52-380-020, 25-57-380-030, 25-57-380-040 Call Order: 211 County: Johnson DBE Goal: None Late Start Date: 2025/04/21 Working Days : 25 Guaranty: $100,000.00 MPIN-380-6(719)0--0N-52 Route: I-380 I-80 to US 218 in Waterloo MPIN-380-6(720)3--0N-52 Route: I-380 From North Liberty to N of US 30 MPIN-380-6(733)17--0N-57 Route: I-380 In Cedar Rapids, from 1 mi N of US 30 to Iowa 100 MPIN-380-6(734)30--0N-57 Route: I-380 From 1 mi N of County Home Rd to Center Point Estimated Value: $1,500,000 - $2,000,000 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 211 - PCC Patching - I-380 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,719,513.00

Public - State/Provincial

Paving, Site Work

44

3

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
95
Bidding Soon
1,134
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

August 11, 2025

Project location map

I-380, North Liberty, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.